15
Operating instructions
HES and SEL
5 Mounting and dismounting
CO
NFIDENTIAL
5
Mounting and dismounting
5.1
Scope of delivery
The belt misalignment switches are delivered ready to
operate. The screws for mechanical fastening are not in-
cluded in the scope of delivery.
One screwed cable gland (
6
) and one dummy plug (
25
)
are included in the scope of delivery
.
Fig. 5-1:
Scope of delivery
Dummy plug (
25
)
Screwed cable gland (
6
)
Beware!
The device must only be operated when all three holes
are closed with the supplied cable gland (
6
) and the
dummy plug (
25
). Only use the supplied screwed cable
gland (
6
) and dummy plugs (
25
), otherwise the seal can
no longer be guaranteed.
!