Step 9: Roof Valley Assembly
Part 3
C:
Place the Half Roof Panel Assembly onto the Playhouse so that the back of the assembly is tight to the roof
assembly and rests on each Roof Valley 3. (Fig. 9.7)
D:
Attach the Half Roof Panel Assembly to Roof Valley using 12 (S37) #7 x 5/8” Pan Screws. (Fig. 9.8)
Fig. 9.7
092
091
Hardware
12 x
#7 x 5/8” Pan Screw
S37
Fig. 9.8
S37
S37
Tight
Tight
36
Содержание GREYSTONE COTTAGE
Страница 51: ...NOTES 51 ...