25
Step 10: Swing Wall Assembly
Part 1
Note: Pre-drill all holes using a 1/8” drill bit before installing the lag screws.
Note: Keep all bolts loose in this step.
A:
On the ground lay flat 2 (1931) Posts then attach (1933) Ground SW with 4 (H2) 1/4 x 2” Hex Bolts (with
lock washer, flat washer and t-nut); and (1895) Floor End using 2 (H2) 1/4 x 2” Hex Bolts (with lock washer, flat
washer and t-nut) in the bottom holes as shown in fig. 10.1.
B:
On the side indicated in fig. 10.1, attach (0369) Lower Diagonal to (1933) Ground SW with 1 (H2) 1/4 x 2”
Hex Bolt (with lock washer, flat washer and t-nut).
C:
Make sure assembly is square and then fasten (1895) Floor End to (1931) Posts in the top holes using 2
(LS1) 1/4 x 1-1/2” Lag Screws (with flat washer); and (0369) Lower Diagonal to (1931) Post with 1 (LS3) 1/4 x 3”
Lag Screw (with flat washer). (fig. 10.2)
Notice the hole
locations of (1895)
Floor End.
Wood Parts
Hardware
Notice bolt holes
on this side.
7 x
1/4 x 2” Hex Bolt (1/4” lock washer, 1/4” flat washer, 1/4” t-nut)
1 x
1/4 x 3” Lag Screw (1/4” flat washer)
2 x
1/4 x 1-1/2” Lag Screw (1/4” flat washer)
1 x
Floor End 1 x 5 x 35-1/4”
1 x
Ground SW 1 x 5 x 68-7/16”
2 x
Post 2 x 4 x 81”
1 x
Lower Diagonal 2 x 3 x 37”
1895
0369
1931
1933
LS1
H2
LS3
1931
H2
Fig. 10.1
1/4” lock
washer
1/4” flat
washer
1/4” t-nut
LS1
0369
1933
1931
1895
H2
H2
H2
H2
Fig. 10.2
1931
1931
1895
LS3
1/4” flat
washer
LS1
1/4” flat
washer
0369
Содержание F29010
Страница 61: ...61 NOTES NOTES...
Страница 62: ...62 NOTES NOTES...
Страница 63: ...63 NOTES NOTES...