![KidKraft F24848 Скачать руководство пользователя страница 106](http://html1.mh-extra.com/html/kidkraft/f24848/f24848_installation-and-operating-instructions-manual_1965937106.webp)
106
Hardware
Step 54: Secure Tunnel to Entrances
A:
Make sure tunnel is tight to both entrances. From inside the tower and the fort attach the tunnel with 8 (S10)
#8 x 1” Pan Screws per side. (fig. 54.1 and 54.2)
B:
From outside the assembly attach Tunnel to the (6037) Tunnel Top on one side and to the (6038) Upper
Tunnel Insert on the other using 4 (S0) #8 x 7/8” Truss Screws per side. (fig. 54.1& 54.3 and 54.4)
16 x
#8 x 1” Pan Screw
8 x
#8 x 7/8” Truss Screw
Fig. 54.2
S0
S10
A
B
C
A
B
C
A
B
C
Fig. 54.1
Fig. 54.3
Fig. 54.4
S10
A
B
C
6038
6037
S0
S0
x 4