S4
1763
Hardware
Wood Parts
2 x
#8 x 3” Wood Screw
S4
1 x
Floor Joist 5/4 x 2 x 38-1/2”
1763
S4
1763
3-1/8”
1-3/8”
3-1/8”
Step 14: Floor Frame Assembly
A:
From inside of the assembly, measure 3-1/8” down from the top of (1759) SW Floor (fig. 14.2) and (1760) Floor
(fig. 14.3) and then attach (1763) Floor Joist to each board with 1 (S4) #8 x 3” Wood Screws per end. Make sure
the (1763) Floor Joist is installed with the 1-3/8” side facing up. (fig. 14.1 & 14.2)
1760
1757
1759
1759
1760
Fig. 14.1
Fig. 14.2
Fig. 14.3
28
Содержание F24145
Страница 40: ...NOTES 40...