95
Step 41: Attach Flange Assembly to Fort
Hardware
14 x
#12 x 1” Pan Screw
4 x
#12 x 2” Pan Screw
8 x
#12 Screw Bezel
S7
(hidden)
S6
A:
With a helper place the Flange Assembly flush to the Crowsnest on the fort as shown in fig. 41.1, then
pre-drill 1/8” pilot holes in the bottom 4 mounting locations on (344) Crowsnest Gap (approximate spots where
circles are on figure), making sure the pre-drilled holes are a minimum of 1” deep.
B:
Attach Flange Assembly to the Crowsnest through (344) Crowsnest Gap and into (332) Crowsnest Front
using 4 (S7) #12 x 2” Pan Screws (with #12 Screw Bezel) in the pre-drilled holes. (fig. 41.1 and 41.2) Make
sure the flat surfaces of the Flange Assembly are flush to the Crowsnest as shown in fig. 41.5.
C:
Attach the Flange Assembly flush to (340) Crowsnest SL Top using 4 (S6) #12 x 1” Pan Screws (with #12
Screw Bezel) as shown in fig. 41.1 and 41.3 and to both (348) Crowsnest Faces using 5 (S6) #12 x 1” Pan
Screw per board. (fig. 41.1 and 41.4)
Flange
Assembly
S7
#12 Screw
Bezel
#12 Screw
Bezel
Bottom
Sides
Top
340
348
332
344
340
Bottom of
slide flush
with deck
Top of slide flush
to 340 Crowsnest
SL Top
Fig. 41.1
Fig. 41.6
Fig. 41.4
Fig. 41.3
Fig. 41.2
Fig. 41.5
(hidden)
Outside View
Inside View
S6
S6
(hidden)
348
348
348
Содержание F23175
Страница 111: ...111 NOTES...