76
A:
On the fourth attached Elbow Assembly remove the pan bolt and nut which is facing the fort (installed in Step 32).
(fig. 41.1) The bolt will no longer be needed, but keep the lock nut.
B:
Loosely attach TNR3 Tube Support (at the slightly bent end) to the slide seam using 1 (PB6) 1/4 x 1” Pan Bolt (with
flat washer and the previously removed lock nut). (fig. 41.2)
C:
Rotate TNR3 Tube Support and attach to (9266) Folding Panel Assembly Right B using 1 (S6) #12 x 1” Pan Screw
as shown in (fig. 41.2).
D:
Fully tighten screw and bolt.
Hardware
1 x
#12 x 1” Pan Screw
1 x
1/4 x 1” Pan Bolt
(1/4” flat washer & 1/4” lock nut - previously removed)
PB6
Other Parts
1 x TNR3 Tube Support
S6
Step 41: Attach TNR 3 Slide to Fort
9266
S6
Remove PB1 (1/4 x 3/4”
Pan Bolt) first then install
PB6 (1/4 x 1” Pan Bolt
with flat washer)
TNR 3 Tube
Support
Lock
Nut
Flat
Washer
PB6
Note: Flat
end down
Fig. 41.1
Fig. 41.2
Содержание COZY ESCAPE PLAYHOUSE F29045
Страница 79: ...79 NOTES ...
Страница 80: ...80 NOTES ...