
17
Step 2: Frame Assembly
Part 2
Hardware
8 x
#8 x 1-3/4” Wood Screw
S15
2 x
Side Tie 1” x 2” x 47-7/16”
022
Wood Parts
S15
Flush to the bottom
Top View
Inside View
022
022
022
021
x 4 per
side
022
S15
C:
Place 1 (022) Side Tie along the bottom of each Side Wall so they are level and flush to the bottom of the (021)
Panel Assembly. Attach using 4 (S15) #8 x 1-3/4” Wood Screws per board. (fig. 2.3, 2.4, 2.5)
Fig. 2.3
Fig. 2.4
Fig. 2.5
Содержание Cedar Summit Timber Trail Playhouse
Страница 71: ...71 NOTES...