40
Warning!
To prevent tipping and avoid potential injury, stakes must
be driven 13” into ground. Digging or driving stakes can be dangerous if you
do not check first for under-ground wiring, cables or gas lines.
A:
In the 5 places shown in fig. 21.1 drive the Rebar Ground Stakes 13” into the ground against (142) Diagonal,
(060) End Panel, (021) Left Access Rail and both (183) SW Posts. Be careful not to hit the washer while
hammering stakes into the ground as this could cause the washer to break off. (fig. 21.1 and 21.2)
B:
Attach ground stakes using 1 (S7) #12 x 2” Pan Screw per ground stake as shown in fig. 21.3.
C:
After driving stakes into the ground, check for sharp edges caused by the impact of the hammer. Smooth any
sharp edges from impact area and touch up with outdoor paint.
Step 21: Install Ground Stakes
MOVE FORT TO FINAL LOCATION PRIOR TO STAKING
FINAL LOCATION MUST BE LEVEL GROUND
Hardware
5 x
#12 x 2” Pan Screw
S7
5 x Rebar Ground Stake
Other Parts
Fig. 21.1
F
ig. 21.3
F
ig. 21.2
SEE FRONT COVER FOR
SAFETY CLEARANCE
Rebar
Ground
Stake
13”
In Ground
S7
024
060
40
142
071
183
40
53
Содержание Cedar Summit COPPER RIDGE PLAYSET
Страница 111: ...NOTES ...