
68
Step 25: Attach Flange Assembly to Fort
Hardware
14 x
#12 x 1” Pan Screw
4 x
#12 x 2” Pan Screw
8 x
#12 Screw Bezel
S7
(hidden)
S6
A:
With a helper place the Flange Assembly flush to the Crowsnest on the fort as shown in fig. 25.1 and 25.5,
then pre-drill 1/8” pilot holes in the bottom 4 mounting locations on (220) Crowsnest Gap Board (approximate
spots where circles are on figure), making sure the pre-drilled holes are a minimum of 1” deep.
B:
Attach Flange Assembly to the Crowsnest through (220) Crowsnest Gap Board and into (202) Crowsnest
Front using 4 (S7) #12 x 2” Pan Screws (with #12 Screw Bezel) in the pre-drilled holes. (fig. 25.1 and 25.2)
Make sure the flat surfaces of the Flange Assembly are flush to the Crowsnest as shown in fig. 25.5.
C:
Attach the Flange Assembly flush to (200) Crowsnest Top using 4 (S6) #12 x 1” Pan Screws (with #12
Screw Bezel) as shown in fig. 25.1 and 25.3 and to both (204) Crowsnest Spacers using 5 (S6) #12 x 1” Pan
Screw per board. (fig. 25.1 and 25.4)
Flange
Assembly
S7
#12 Screw
Bezel
#12 Screw
Bezel
Bottom
Sides
Top
200
204
202
200
Bottom of
slide flush
with deck
Top of slide flush
to (200) Crowsnest
Top
Fig. 25.1
Fig. 25.6
Fig. 25.4
Fig. 25.3
Fig. 25.2
Fig. 25.5
(hidden)
Outside View
Inside View
S6
S6
(hidden)
204
204
204
220
Содержание BROCKWELL
Страница 101: ...101 NOTES...