2009 > G 2.7 DOHC >
INSPECTION
1. Remove the fuse box cover.
2. Remove the starter relay.
3. Using an ohmmeter, check that there is continuity between each terminal.
Terminal
Continuity
30 - 87
NO
85 - 86
YES
4. Apply 12V to terminal 85 and ground to terminal 86.
Check for continuity between terminals 30 and 87.
5. If there is no continuity, replace the starter relay.
6. Install the starter relay.
7. Install the fuse box cover.
Содержание Carnival 2009
Страница 1: ...Engine Electrical System General Information Engine SLJ YPcal System ...
Страница 13: ...Engine Electrical System Ignition System Engine Electrical System ...
Страница 18: ...INSPECT IGNITION COIL 1 Standard 0 0715 0 015 Mesure the resistance between the terminals No 1 and No 3 ...
Страница 19: ...Engine Electrical System Charging System Engine SLJ YPcal System ...
Страница 26: ...Engine Electrical System Charging System Alternator Engine SLJ YPcal System ...
Страница 27: ...2009 G 2 7 DOHC COMPONENT ...
Страница 31: ...Engine Electrical System Charging System Battery Engine SLJ YPcal System ...
Страница 36: ...Engine Electrical System Starting System Engine SLJ YPcal System ...
Страница 40: ...Engine Electrical System Starting System Starter Engine SLJ YPcal System ...
Страница 41: ...2009 G 2 7 DOHC COMPONENT ...
Страница 48: ...Engine Electrical System Starting System Starter Relay Engine Electrical System ...