3
Pitching your tent/awning
8.
Peg out the pegging points around the base of the tent/awning
11.
Peg out guy lines and ventilation on the rear of the Tent
-
these guy lines should be pegged out at 45° angles.
*Fig 2.
-
Peg black strap out, Fluorescent strap then clips in place, lastly adjust the tension on the guy line.
(be careful not to overtighten guy lines—they should be taught but not so tight that they pull/distort the air frame)
9.
Peg out the side
‘
Precision Pitch
’
Guy Ropes, these guy ropes are designed to be unclipped quickly and easily in
fair weather to help reduce trip hazards without having to unpeg.
If the wind starts to increase just simply clip back into place (fig 2.)
12.
Fit the dust cap onto the Airframe Valve and Velcro down the waterproof cover.
10.
Fit the small fibreglass pole into the side
‘
Eyebrow
’
rain canopy
-
slide the pole into the sleeve and locate one
end into the plastic cup.
When fitting the other side ensure the pole is pushed into the sleeve as much as possible, prior to locating the
end into the plastic cup