U S E R G U I D E
U S E R G U I D E
1 - Installation: connect the Magravs Power Unit to the power supply.
1.1
How to determine the “Live” or “Hot” wire of your socket:
The Magravs Power Unit comes with a Phase Meter to be used to determine which
plug of your household socket is connected to the “Live” or “hot” wire.
The plug in which the phase meter turns on its light permanently or flashes much
more quickly than the other plug is where the live wire is located.
1.2
Connect the Magravs Power Unit to the socket correctly ensuring that
the plug terminal marked with a red adhesive label as “Live” matches the
“Live” plug of your socket.
If the Magravs Power Unit is connected
wrongly to the “Neutral” wire
instead of “Live”, there is a very
high possibility of the unit being
damaged IREVERSIBLY.
Such damage falls outside the scope
of manufacturer’s warranty.
WA R N I N G : “ L I V E ” I S M A R K E D W I T H A N A D H E S I V E L A B E L
P H A S E M E T E R
8
9
If your wall socket is served by 2 Live wires, that is, if you detect 115V in each
hole of the socket or NEUTRAL is not connected to GROUND at ZERO potential
then, it is very likely that your locale is served by 2 or more electrical phases.
For technical details on power distribution networks and how to check if the
NEUTRAL is connected to the earth go to
mymagravs.com
.
In this case the Magravs Power Unit may not work or may need a longer time
to complete the process of CONDITIONING.
If you do not notice any further reduction in the electricity bill, then the electrical
system on which you installed the Magravs NOT connected the Neutral
Ground.
2 - Installation: connect a load to the Magravs Power Unit socket.
Choose one of the following options.
2.1
Connect a refrigerator or freezer to the Magravs Power Unit.
2.2
Connect to the Unit (preferably) one LED lamp or a few lamps for a combined
total rating of 200W maximum, NOT equivalent and keep this load constantly
running 24/7.
The bulbs used in the lamps should preferably be LED bulbs. Fluorescent bulbs
may be used but they are not as effective as LED. Incandescent (filament-type)
bulbs should not be used.
A lighter load will still serve to nano-coat your home; however the process will
take more time.
After about 2 weeks, reduce this load to a single lamp with 15W - 25W LED bulb
and keep this load constantly running 24/7 on the Unit.
Again, a lighter load will still serve to nano-coat your home; however the process
will take more time. We recommend not going below 15W.
Over the next months, simply allow the system to operate without interruption,
if possible. If interruption occurs, simply resume as normal.