
Installation Note N9020-90257
15
Option BBA, Analog Baseband I/Q Inputs Retrofit Kit
2.
. Locate and install labels
, “Remove Both Cables Before Lifting”
on the top of each board extractor, both the right and left hand side.
3.
Route ribbon cable
from the BBIQ Main board through the chassis side wall and out
to the front of the instrument.
4.
Gently press the cable into place until it snaps into the connector of the BBIQ Main board.
Figure 9
Cable Installation
Use the end of the cable furthest from the ferrite block.