background image

Installation Note

Keysight

 Add Configurable Test Set and 

Source Attenuators Upgrade Kit

To Upgrade PNA N5231A/B, N5232A/B, or N5239A/B Option 200 

to Option 216

Upgrade Kit Order Numbers: N5231AU-216, N5232AU-216, 

N5239AU-216

, N5231BU-216, N5232BU-216, and 

N5239

BU

-216

Keysight Kit Number: N5232-60101

Содержание N5231B

Страница 1: ...est Set and Source Attenuators Upgrade Kit To Upgrade PNA N5231A B N5232A B or N5239A B Option 200 to Option 216 Upgrade Kit Order Numbers N5231AU 216 N5232AU 216 N5239AU 216 N5231BU 216 N5232BU 216 and N5239BU 216 Keysight Kit Number N5232 60101 ...

Страница 2: ...to U S government customers under its standard commercial license which is embodied in its End User License Agreement EULA a copy of which can be found at http www keysight com find sweula The license set forth in the EULA represents the exclusive authority by which the U S government may use modify distribute or disclose the Software The EULA and the license set forth therein does not require or ...

Страница 3: ...network analyzer 60 dB source step attenuators with brackets and wire harnesses front panel jumpers cable guards for front panel jumpers front panel overlay replacement new cables After installation of this upgrade your analyzer will be an N5231A B Option 216 N5232A B Option 216 or N5239A B Option 216 Some of the assembly drawings in this document may be different from your instrument but the proc...

Страница 4: ...e Web at http www keysight com find assist If you do not have access to the Internet please contact your Keysight field engineer If You Have Problems With the Upgrade Kit Contents Keysight stands behind the quality of the upgrade kit contents If you have problems with any item in the kit refer to www keysight com and the Contact Keysight link In any correspondence or telephone conversation refer t...

Страница 5: ...r the Installation on page 8 Enough time refer to About Installing the Upgrade on page 8 Test equipment for the post upgrade adjustments and full instrument calibration To view the equipment list click the Chapter 3 bookmark Tests and Adjustments in the PDF Service Guide1 The PNA contains extremely sensitive components that can be ruined if mishandled Follow instructions carefully when making cabl...

Страница 6: ...ur new HostID go to http www na support keysight com pna upgrades html and using the HostID utility enter the PNA serial number and your new upgraded PNA L model number N5231A B and N5232A B Host ID The only difference between an A model license key redemption and a B model is that the A model uses a 12 character license key and the B model uses a license key file Ensure that you are connected to ...

Страница 7: ...B model license key file s attachment message Refer to License Key Redemption on page 6 Downloading the Online PNA Service Guide To view the online Service Guide for your PNA model number use the following steps 1 Go to www keysight com 2 In the Search box enter the model number of the analyzer Ex N5232A and click Search 3 Click Technical Support Manuals 4 Click Service Manual 5 Click the service ...

Страница 8: ... ESD heel strap for use with conductive floors 9300 1308 Description Qty Part Number T 10 TORX driver set to 9 in lbs 1 02 N m 1 N A T 20 TORX driver set to 21 in lbs 2 38 N m 1 N A 5 16 in 8 mm nutsetter or open end torque wrench set to 10 in lbs 1 13 N m 1 N A Use a 5 16 in torque wrench set to 10 in lbs on all cable connections except the front panel and rear panel bulkhead connectors Torque th...

Страница 9: ...34 Front panel overlay A Models 1 N5232 80005 Front panel overlay B Models 1 N5232 80010 Front panel jumper cable guard A Models 2 N5242 00029 Front panel jumper cable guard B Models 2 N5242 00048 Dust caps for test ports 2 1401 0214 W11 RF cable A21 MASSY to A29 60 dB step attenuator 1 N5232 20026 W12 RF cable A21 MASSY to A30 test port 2 source attenuator 1 N5232 20019 W13 RF cable A29 60 dB ste...

Страница 10: ...l jumper 6 N5222 20091 Wire harness A19 test set motherboard J8 to A29 60 dB step attenuator 1 8121 0982 Wire harness A19 test set motherboard J6 to A30 test port 2 source attenuator 1 Extra quantities of items such as protective plastic caps screws cable ties and cable clamps may be included in this upgrade kit It is normal for some of these items to remain unused after the upgrade is completed T...

Страница 11: ...or Assemblies Step 7 Install the A29 and A30 Source Attenuator Assemblies Step 8 Install the Cables Step 9 Secure the Hex Nuts on the Front Panel Bulkhead Connectors Step 10 Remove the Old Lower Front Panel Overlay Step 11 Reinstall Front Panel Assembly Step 12 Install the New Lower Front Panel Overlay Step 13 Install Front Panel Jumpers Step 14 Reinstall the Inner Cover Step 15 Reinstall the Oute...

Страница 12: ...nse key A models or license key file B models has been received and the information verified you can proceed with the installation at Step 2 Remove the Outer Cover on page 12 Step 2 Remove the Outer Cover For instructions click the Chapter 7 bookmark Removing the Covers in the PDF Service Guide1 Step 3 Remove the Inner Cover For instructions click the Chapter 7 bookmark Removing the Covers in the ...

Страница 13: ... cable bracket W1 top side cable N5235 20040 A4 13 5 GHz Source Synthesizer board to test set deck cable bracket W10 N5232 20081 A24 mixer brick to test set deck cable bracket Step 6 Assemble the A29 and A30 Source Attenuator Assemblies Refer to Figure 1 for this step of the procedure New parts are listed in Table 1 on page 9 1 Gather two source attenuators 33321 60082 and install a ribbon cable 8...

Страница 14: ...A30 Source Attenuator Assemblies Refer to Figure 2 for this step of the procedure New parts are listed in Table 1 on page 9 1 Install both source attenuator assemblies to the deck as shown using two screws 0515 0372 with each assembly Use a T 10 TORX driver set to 9 in lbs to tighten all screws Figure 2 Source Attenuators Installation ...

Страница 15: ... install three cable clamps part number 1400 1334 to secure W22 part number N5232 20031 Follow instructions carefully when making cable connections especially wire harness connections Incorrect connections can destroy components resulting in additional customer costs Be careful not to damage the center pins of the semirigid cables Some flexing of the cables may be necessary but do not over bend th...

Страница 16: ...r 1400 1334 to secure W19 part number N5232 20025 W23 N5232 20024 A24 mixer brick to REF 2 RCVR R2 IN As shown in Figure 3 install three cable clamps part number 1400 1334 to secure W23 part number N5232 20024 W24 N5232 20023 A24 mixer brick to PORT 2 RCVR B IN W20 N5232 20022 A26 test port 2 bridge coupler arm to PORT 2 CPLR ARM W1 reuse top side cable N5235 20040 A4 13 5 GHz Source Synthesizer b...

Страница 17: ... MASSY to REF 1 SOURCE OUT As shown in Figure 4 install one cable clamp part number 1400 1334 to secure W18 part number N5232 20032 Figure 4 Location of Cable Clamps to Secure W18 W21 N5232 20030 A24 mixer brick to PORT 1 RCVR A IN W17 N5232 20029 A25 test port 1 bridge coupler arm to PORT 1 CPLR ARM W15 N5232 20028 A25 test port 1 bridge coupler thru to PORT 1 CPLR THRU W13 N5232 20027 A29 60 dB ...

Страница 18: ...h hex nuts If not already done secure the cable connectors to the front panel bulkhead with the hex nuts torquing to 21 in lbs Step 10 Remove the Old Lower Front Panel Overlay Refer to Figure 5 for this step of the procedure Although a 4 port PNA is shown in the graphic the concept is the same for the 2 port PNA New parts are listed in Table 1 on page 9 1 From the back side of the front panel use ...

Страница 19: ...Installation Note N5232 90101 19 Installation Procedure for the Upgrade Figure 5 Lower Front Panel Overlay Replacement ...

Страница 20: ...20 Installation Note N5232 90101 Installation Procedure for the Upgrade Step 11 Reinstall Front Panel Assembly Refer to Figure 6 for this step of the procedure Figure 6 Front Panel Assembly Installation ...

Страница 21: ...in Table 1 on page 9 1 Remove the protective backing from the new front panel overlay N5232 80005 A models or N5232 80010 B models item 2 Starting from either side loosely place the overlay in the recess on the lower front panel ensuring that it fits tightly against the edges of the recess 3 Once the overlay is in place press it firmly onto the frame to secure it 4 Be sure to install the two new s...

Страница 22: ... 20091 Torque to 10 in lbs Figure 7 Front Panel Jumper Cables Installation Step 14 Reinstall the Inner Cover For instructions click the Chapter 7 bookmark Removing the Covers in the PDF Service Guide1 Step 15 Reinstall the Outer Cover For instructions click the Chapter 7 bookmark Removing the Covers in the PDF Service Guide1 1 See Downloading the Online PNA Service Guide on page 7 ...

Страница 23: ...k Remove B Model Option 200 License Removal Procedure For A models refer to A Model Option 200 License Removal Procedure 1 To start the Keysight License Manager press Start Keysight License Manager Keysight License Manager A Keysight License Manager dialog box will appear 2 Right click on the desired option 3 In the Select Desired Option list click 200 4 Click Remove 5 A message displays stating t...

Страница 24: ...se message you received from Keysight Enter this key exactly as it is printed on the message 5 Click Enable A Model Option Verification Procedure Once the analyzer has restarted and the Network Analyzer program is again running 1 On the analyzer s Help menu click About Network Analyzer 2 Verify that 216 is listed after Options in the display Click OK Option Enable Procedure for B Model Instruments...

Страница 25: ...delete the feature that is not required for this upgrade e g in this case N5242B 423 is the correct upgrade So N5242B 422 is to be deleted from the text file Figure 8 Editing a Keysight License File Using a Text Editor Note This figure may not contain your specific features and is an example only In this example N5242B 422 is the incorrect feature N5242B 423 is the correct feature d Re save the te...

Страница 26: ...rogram is running Press Help About NA and verify that Option 216 is listed in the PNA application 3 After successful installation of all upgrades some features require some adjustments to ensure the instrument meets its specified performance Refer to the following Web site http na support keysight com pna If the option s not been enabled or if Option 200 has not been removed contact Keysight Techn...

Страница 27: ...ents in the PDF Service Guide1 After the specified adjustments have been performed the analyzer should operate and phase lock over its entire frequency range Operator s Check Perform the Operator s Check to check the basic functionality of the analyzer For instructions click the Chapter 3 bookmark Tests and Adjustments in the PDF Service Guide1 If you experience difficulty with the basic functioni...

Страница 28: ...he PNA for the User 1 If necessary reinstall front jumper cables 2 Install the cable guards pushing them over the front jumper cables until the cushioning material touches the front panel of the PNA 3 Install the dust caps on the test ports 4 Clean the analyzer as needed using a damp cloth ...

Страница 29: ...Installation Note Xxxxx xxxxx 3 ...

Страница 30: ...This information is subject to change without notice Keysight Technologies 2012 2019 Edition 2 September 2019 www keysight com ...

Отзывы: