Keysight N5224B/25B Service Guide 3-11
Tests and Adjustments
Non-Standards Compliant Verification
Non-Standards Compliant Verification
To meet the criteria for non-standards compliant verification, perform the
preliminary checks and the performance tests while
stopping to troubleshoot.
Refer to
for test flow. Troubleshoot and repair the first problem
encountered without continuing to other tests. After you troubleshoot, repair,
and adjust, repeat the last failed portion and generate a new set of data.
Figure 3-2
Non–Standards Compliant Verification Flowchart
Содержание N5224B
Страница 3: ...3...
Страница 4: ...4...
Страница 12: ...12 Keysight N5224B 25B Service Guide Contents...
Страница 84: ...3 52 Keysight N5224B 25B Service Guide Tests and Adjustments Adjustments 3...
Страница 145: ...Keysight N5224B 25B Service Guide 4 61 Troubleshooting This page intentionally left blank...
Страница 212: ...5 50 Keysight N5224B 25B Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 17 4 Port Receiver Group...
Страница 213: ...Keysight N5224B 25B Service Guide 5 51 Theory of Operation Receiver Group Operation Figure 5 18 2 Port Receiver Group...
Страница 220: ...5 58 Keysight N5224B 25B Service Guide Theory of Operation Power Supply Group Operation 5...
Страница 225: ...Keysight N5224B 25B Service Guide 6 5 Replaceable Parts Rebuilt Exchange Assemblies Figure 6 1 Module Exchange Procedure...
Страница 490: ...6 270 Keysight N5224B 25B Service Guide Replaceable Parts Replaceable Parts Listings 6...
Страница 608: ...8 102 Keysight N5224B 25B Service Guide General Purpose Maintenance Procedures Correction Constants 8...
Страница 612: ...Appendix 4 Service Guide EEPROM Address Assignments and Location N5224 5A B PNA and N5244 5A B PNA X Instruments...
Страница 613: ...Installation Note Xxxxx xxxxx 3...