background image

Installation Note N5225-90103

                                                                                                                        

 17

Figure 5

Location of Cable Clamps to Secure W33

• W104 (N5245-20057) A49 port 2 receiver attenuator to A27 mixer brick (B)
• W47 (N5245-20119) REF 2 RCVR R2 IN to A27 mixer brick (R2) 
• W47 (N5245-20119) REF 2 RCVR R2 IN to A27 mixer brick (R2) 
• W18 (N5245-20049) A32 port 2 receiver coupler to W17
• W12 (N5245-20050) A29 port 1 receiver coupler to W11
• W82 (N5245-20077) A38 port 1 source attenuator to front-panel Port 1 SOURCE OUT
• W42 (reuse) (N5245-20007) REF 1 RCVR R1 IN to A37 reference mixer switch
• W41 (reuse) (N5245-20006) A37 reference mixer switch to front-panel REF 1 SOURCE OUT
• W21 (N5245-20118) A29 port 1 receiver coupler to A37 reference mixer switch

Содержание N5224AU-217

Страница 1: ...t Add Source and Receiver Attenuators Upgrade Kit Installation Note To Upgrade PNA N5224A or N5225A Option 201 to Option 217 Upgrade Kit Order Numbers N5224AU 217 or N5225AU 217 Keysight Kit Number N5225 60103 ...

Страница 2: ......

Страница 3: ...ial item as defined in FAR 2 101 a or as Restricted computer software as defined in FAR 52 227 19 June 1987 or any equivalent agency regulation or contract clause Use duplication or disclosure of Software is subject to Keysight Technologies standard commercial license terms and non DOD Departments and Agencies of the U S Government will receive no greater than Restricted Rights as defined in FAR 5...

Страница 4: ...g Assistance from Keysight By internet phone or fax get assistance with all your test and measurement needs Contacting Keysight Assistance with test and measurements needs and information on finding a local Keysight office are available on the Web at http www keysight com find assist If you do not have access to the Internet please contact your Keysight field engineer NOTE In any correspondence or...

Страница 5: ...grade adjustments and full instrument calibration To view the equipment list click the Chapter 3 bookmark Tests and Adjustments in the PDF Service Guide1 License Key Redemption NOTE The enclosed Option Entitlement Certificate is a receipt verifying that you have purchased a licensed option for the PNA of your choice You must now use a Keysight Web page to request a license key for the instrument t...

Страница 6: ...ervice Guide is displayed scroll through the Contents section bookmarks to locate the information needed Protecting Your Workspace from Electrostatic Discharge For information click on the Chapter 1 bookmark Electrostatic Discharge Protection in the PDF Service Guide1 ESD Equipment Required for the Installation 1 See Downloading the Online PNA Service Guide on page 5 Description Keysight Part Numb...

Страница 7: ...set to 9 in lbs 1 02 N m 1 N A T 20 TORX driver set to 21 in lbs 2 38 N m 1 N A 5 16 in 8 mm nutsetter or open end torque wrench set to 10 in lbs 1 13 N m 1 N A Products affected N5224A and N5225A Option 201 Installation to be performed by Keysight service center or personnel qualified by Keysight Estimated installation time 2 hours Estimated adjustment time 0 5 hour Estimated full instrument cali...

Страница 8: ...ck 4 0515 0430 W12 A29 port 1 receiver coupler to W11 1 N5245 20050 W18 A32 port 2 receiver coupler to W17 1 N5245 20049 W21 A29 port 1 receiver coupler to A37 reference mixer switch 1 N5245 20118 W33 RF cable A32 port 2 receiver coupler to front panel REF 2 SOURCE OUT 1 N5245 20010 W47 REF 2 RCVR R2 IN to A27 mixer brick R2 1 N5245 20119 W81 RF cable A29 test port 1 receiver coupler to A38 test p...

Страница 9: ...s upgrade kit It is normal for some of these items to remain unused after the upgrade is completed Ribbon cable A23 test set motherboard J549 to A38 test port 1 source attenuator 2 N5245 60006 Ribbon cable A23 test set motherboard J546 to A41 test port 2 source attenuator Table 1 Contents of Upgrade Kit N5225 60103 Ref Desig Description Qty Part Number ...

Страница 10: ... Outer Cover Step 3 Remove Some Bottom Side Test Set Cables Step 4 Assemble the A46 and A49 Receiver Attenuator Assemblies Step 5 Install the A46 and A49 Receiver Attenuator Assemblies Step 6 Assemble the A38 and A41 Source Attenuator Assemblies Step 7 Install the A38 and A41 Source Attenuator Assemblies Step 8 Install Some Bottom Side Test Set Cables Step 9 Remove the Old Lower Front Panel Overla...

Страница 11: ...pgrade will be installed If the model number serial number or option number do not match those on your license key you will not be able to install the option If this is the case contact Keysight for assistance before beginning the installation of this upgrade Refer to Contacting Keysight on page 3 Once the license key has been received and the information verified you can proceed with the installa...

Страница 12: ...039 A29 test port 1 receiver coupler to front panel Port 1 SOURCE OUT W21 N5245 20120 A29 port 1 receiver coupler to A37 reference mixer switch W31 N5245 20040 A32 test port 2 receiver coupler to front panel Port 2 SOURCE OUT W35 N5245 20121 A32 port 2 receiver coupler to front panel REF 2 SOURCE OUT W37 N5245 20041 Front panel Port 1 RCVR A IN to A27 mixer brick A W40 N5245 20042 Port 2 RCVR B IN...

Страница 13: ...the A46 and A49 Receiver Attenuator Assemblies Refer to Figure 1 for this step of the procedure New parts are listed in Table 1 on page 7 Use a T 10 TORX driver to tighten all screws Figure 1 Port 1 and Port 2 Receiver Attenuator and Bracket Assembly ...

Страница 14: ...e A46 and A49 Receiver Attenuator Assemblies Refer to Figure 2 for this step of the procedure New parts are listed in Table 1 on page 7 Use a T 10 TORX driver to tighten all screws Figure 2 Port 1 and Port 2 Receiver Attenuator Assemblies Installation ...

Страница 15: ...6 Assemble the A38 and A41 Source Attenuator Assemblies Refer to Figure 3 for this step of the procedure New parts are listed in Table 1 on page 7 Use a T 10 TORX driver to tighten all screws Figure 3 Source Attenuator and Brackets Assembly ...

Страница 16: ... Install the A38 and A41 Source Attenuator Assemblies Refer to Figure 4 for this step of the procedure New parts are listed in Table 1 on page 7 Use a T 10 TORX driver to tighten all screws Figure 4 Source Attenuator Assemblies Installation ...

Страница 17: ...okmarks Bottom RF Cables 2 port Configuration Option 217 in the PDF Service Guide1 New parts are listed in Table 1 on page 7 Install the following new cables in the order listed W103 N5245 20055 Port 2 RCVR B IN to A49 port 2 receiver attenuator W94 N5245 20031 A41 port 2 source attenuator to front panel Port 2 SOURCE OUT W33 N5245 20010 A32 port 2 receiver coupler to front panel REF 2 SOURCE OUT ...

Страница 18: ... R2 IN to A27 mixer brick R2 W18 N5245 20049 A32 port 2 receiver coupler to W17 W12 N5245 20050 A29 port 1 receiver coupler to W11 W82 N5245 20077 A38 port 1 source attenuator to front panel Port 1 SOURCE OUT W42 reuse N5245 20007 REF 1 RCVR R1 IN to A37 reference mixer switch W41 reuse N5245 20006 A37 reference mixer switch to front panel REF 1 SOURCE OUT W21 N5245 20118 A29 port 1 receiver coupl...

Страница 19: ...r to A41 port 2 source attenuator Install the Ribbon Cables To see an image showing the location of these cables click the Chapter 6 bookmarks Bottom Ribbon Cables and Wire Harnesses 2 port Option 217 in the PDF Service Guide1 New parts are listed in Table 1 on page 7 Connect step attenuator ribbon cables as follows N5245 60006 A38 port 1 source step attenuator to A23 test set motherboard J549 N52...

Страница 20: ...NA New parts are listed in Table 1 on page 7 1 From the back side of the front panel use a blunt object in the cutouts in the lower front dress panel to push on the old overlay item and separate it from the front dress panel 2 From the front side of the front panel pull off the overlay completely and discard it 3 Remove any adhesive remaining on the front panel Figure 7 Lower Front Panel Overlay R...

Страница 21: ... in Table 1 on page 7 1 Remove the protective backing from the new front panel overlay N5225 80002 item 2 Starting from either side loosely place the overlay in the recess on the lower front panel ensuring that it fits tightly against the edges of the recess 3 Once the overlay is in place press it firmly onto the frame to secure it Step 12 Reinstall Front Panel Jumpers As shown in Figure 8 reinsta...

Страница 22: ... utility press UTILITY then then An option enable dialog box will appear 2 Click the arrow in the Select Desired Option box A list of available options will appear 3 In the Select Desired Option list click 217 Configurable TS Attens 4 Using the keyboard enter the license key in the box provided The license key is printed on the the license message you received from Keysight Enter this key exactly ...

Страница 23: ...nstructions click the Chapter 3 bookmark Tests and Adjustments in the PDF Service Guide1 If you experience difficulty with the basic functioning of the analyzer contact Keysight Refer to Contacting Keysight on page 3 Calibration Although the analyzer functions its performance relative to its specifications has not been verified It is recommended that a full instrument calibration be performed usin...

Страница 24: ...This information is subject to change without notice Keysight Technologies 2011 2013 2014 August 2014 N5225 90103 N5225 90103 www keysight com ...

Отзывы: