Contents
5
1 Unpack and Verify the Shipment Contents
Initial Inspection..........................................................................................................10
Electrostatic Discharge Protection..........................................................................10
Inspect for Damage..................................................................................................10
Verify M9410A/M9411A Shipment Contents.............................................................11
Instrument Symbols....................................................................................................12
2 Hardware Installation
Chassis and Controller Preparation............................................................................14
Hardware Requirement............................................................................................14
Controller System Requirement...............................................................................15
Power Up the Controller...........................................................................................15
Install Modules............................................................................................................16
M9410A/M9411A Front Panel Overview.....................................................................19
M9300A Reference Preparation..................................................................................21
3 Software Installation and Licensing
Get the M9410A/M9411A software............................................................................26
Software Installation...................................................................................................27
Uninstalling the Software.........................................................................................31
If Installation Fails....................................................................................................31
Keysight M9410A/M9411A Signal Transceiver Licensing Options............................34
Fixed Licenses..........................................................................................................34
Transportable Licenses............................................................................................35
Network Licenses.....................................................................................................35
USB Portable Licenses.............................................................................................36
Configuring Network and USB Licenses..................................................................37
Licensing Measurement Application Software - After Initial Purchase.....................38
Install License by Using a USB Storage Device......................................................38
Install License by Using License Manager...............................................................40
Transporting a License................................................................................................42
Содержание M9411A
Страница 1: ...Keysight M9410A M9411A VXT PXIe Vector Transceiver Getting Started Guide...
Страница 8: ...8 Contents...
Страница 24: ...24 Hardware Installation M9300A Reference Preparation...
Страница 56: ...56 Launching Modular TRX Application Launching Modular TRX Application with Launcher...
Страница 70: ...70 Using Modular TRX application Using the Interactive Help System...