16
DSOX1204A/G Oscilloscopes Service Guide
2
Testing Performance
Overview
Let the Equipment Warm Up Before Testing
For accurate test results, let the test equipment and the oscilloscope warm up
30 minutes before testing.
Verifying Test Results
During the tests, record the readings in the Performance Test Record on
.
To verify whether a test passes, verify that the reading is within the limits in the
Performance Test Record.
If a performance test fails
If a performance test fails, first perform the User Cal procedure. Press the following keys to access User
Cal: [Utility]
→
Service
→
Start User Cal.
Содержание InfiniiVision DSOX1204A
Страница 1: ...Keysight InfiniiVision DSOX1204A G Oscilloscopes Service Guide ...
Страница 8: ...8 DSOX1204A G Oscilloscopes Service Guide Figures ...
Страница 10: ...10 DSOX1204A G Oscilloscopes Service Guide Tables ...
Страница 36: ...36 DSOX1204A G Oscilloscopes Service Guide 2 Testing Performance ...
Страница 48: ...48 DSOX1204A G Oscilloscopes Service Guide 5 Replacing Assemblies ...
Страница 50: ...50 DSOX1204A G Oscilloscopes Service Guide 6 Replaceable Parts ...
Страница 56: ...56 DSOX1204A G Oscilloscopes Service Guide Index ...