
7 Run Power Calibration
S9101A 5G Multi-Band Vector Transceiver, Startup Guide
67
7. 4. 2 Using X-Apps to Perform Alignments
All alignments must be performed before Power Calibration.
1. If it is not already running, start the Modular TRX interface:
The Modular TRX interface can be started as follows:
Select the
Start
menu (lower-left corner icon)
> Scroll down to "
K
" applications
> Select the
Keysight Modular Transceiver
drop-down arrow
> Scroll down the list and select
LaunchModularTRX
2. Select the settings icon (top right corner of the display).
3. Select Alignments (all alignments must be performed before calibrations).
a. Select Align Now All.
b. Select Align IF Cable.
Содержание S9101A
Страница 1: ...Startup Guide S9101A 5G Multi Band Vector Transceiver...
Страница 6: ...2 S9101A 5G Multi Band Vector Transceiver Startup Guide...
Страница 34: ...30 S9101A 5G Multi Band Vector Transceiver Startup Guide...
Страница 42: ...38 S9101A 5G Multi Band Vector Transceiver Startup Guide...
Страница 44: ...40 S9101A 5G Multi Band Vector Transceiver Startup Guide...
Страница 54: ...50 S9101A 5G Multi Band Vector Transceiver Startup Guide...
Страница 97: ...S9101A 5G Multi Band Vector Transceiver Startup Guide 93...