29
Getting Started
STEP 3. Install the Network Analyzer Modules
Figure 1-21 Cable Connections For High Power Measurement Configuration with M9378B
d.
below shows the
cable connection for Wide Dynamic Range measurement with M9378A
and M9378B.
Figure 1-22 Cable Connections For Wide Dynamic Range Configuration with M9378A
Figure 1-23 Cable Connections For Wide Dynamic Range Configuration with M9378B
e.
below shows the
cable connection for high gain measurement with M9378A and M9378B.
Содержание M9300A
Страница 4: ...4 Contents ...
Страница 42: ...42 Getting Started STEP 5 Verify Operation of the Network Analyzer Modules ...