Assembly
35
Step 21
Note: Stretch all cables out completely and make sure all twisting is removed before installing.
Install Pec Dec Cable (112) as detailed in
Figure 21
. Follow dotted lines to identify exact location
of pulleys.
See Page 43 “Cable View” for more detail.
You will need the following for installation:
Cable (112) - Qty. 1
Pulley (57) - Qty. 3
Bolt (141) - Qty. 3
Washers (143) - Qty. 6
Nut (144) - Qty. 3
Philips Screw (103) - Qty. 2
Figure 21
Содержание Horizontal Pressing Station KPS-2050
Страница 5: ...Assembly 5 Box 1 ...
Страница 6: ...Assembly 6 Box 2 ...
Страница 7: ...Assembly 7 Box 3 ...
Страница 8: ...Assembly 8 Box 4 ...
Страница 9: ...Assembly 9 Box 5 ...
Страница 10: ...Assembly 10 Box 6 ...
Страница 11: ...Assembly 11 Box 7 Box 8 Box 10 Box 12 Box 9 Box 11 ...
Страница 12: ...Assembly 12 ...
Страница 13: ...Assembly 13 ...
Страница 14: ...Assembly 14 ...
Страница 40: ...Assembly 40 Congratulations You have completed the assembly of your new KPS 2050 ...
Страница 43: ...Cable View 43 ...
Страница 44: ...Top View 44 ...
Страница 45: ...Exploded View 45 ...