Assembly
22
Step 8
Slide the Right Pec Dec Arm (22) on to the shaft of the Pec Dec Mount (21). Secure the arm in place using
one Big Washer (102), one Washer (143), one Spring Washer (119), and one Allen Bolt (128).
Slide Pec Dec Handle Bar (24) onto the top of the Right Pec Dec Arm (22) and secure using one Chrome
Washer (101), one Washer (143), one Spring Washer (119), and one Allen Bolt (128).
Repeat this step to complete the Left Pec Dec assembly.
Figure 8
Содержание Horizontal Pressing Station KPS-2050
Страница 5: ...Assembly 5 Box 1 ...
Страница 6: ...Assembly 6 Box 2 ...
Страница 7: ...Assembly 7 Box 3 ...
Страница 8: ...Assembly 8 Box 4 ...
Страница 9: ...Assembly 9 Box 5 ...
Страница 10: ...Assembly 10 Box 6 ...
Страница 11: ...Assembly 11 Box 7 Box 8 Box 10 Box 12 Box 9 Box 11 ...
Страница 12: ...Assembly 12 ...
Страница 13: ...Assembly 13 ...
Страница 14: ...Assembly 14 ...
Страница 40: ...Assembly 40 Congratulations You have completed the assembly of your new KPS 2050 ...
Страница 43: ...Cable View 43 ...
Страница 44: ...Top View 44 ...
Страница 45: ...Exploded View 45 ...