OVERALL VIEW
1
Reduction gear
2
Flashing device
3 Antenna
4
Key selector
5 Photocell
6 Bollard
7 Ratchet
8
Limit device
9
Warning notice
10
Check stop
10
1
4
7
8
6
3
2
9
5
6
10
8
5
5
PRELIMINARY CHECKS
Before starting installation it is recommended to carry out the following checks and operations:
1_The structure of the gate must be solid and appropriate.
2_During the run, the gate must not present excessive side disbandment.
3_The lower wheels/rail and the higher roller/guide systems must work without excessive friction.
4_To avoid the disbandment of the gate the sliding gate limit devices, both in aperture and in closu-
re, and a second higher roller/guide must be installed in compliance with current regulations.
5_In pre-existing gates remove any manual lock.
6_Lay the ducts for the energy supply (Ø25-50mm) and for the outside connection (photocell,
flashing device, key selector, etc.) to the base of the gate.
Содержание 900SC-200CS
Страница 11: ...11 ITALIANO NOTE ANMERKUNGEN NOTES NOTA NOTES OBSERVA ES...
Страница 21: ...21 ENGLISH NOTE ANMERKUNGEN NOTES NOTA NOTES OBSERVA ES...
Страница 31: ...31 FRAN AIS NOTE ANMERKUNGEN NOTES NOTA NOTES OBSERVA ES...
Страница 41: ...41 DEUTSCH NOTE ANMERKUNGEN NOTES NOTA NOTES OBSERVA ES...
Страница 51: ...NOTE ANMERKUNGEN NOTES NOTA NOTES OBSERVA ES...
Страница 61: ...NOTE ANMERKUNGEN NOTES NOTA NOTES OBSERVA ES...