Read Installation Manual Carefully
†
Ensure that there is at least 9 feet head of water pressure at the
top of the boiler .
†
Ensure that ALL dust particles, filings , plastic chips etc. are
removed from the inlet pipe.
†
If the installation is a replacement the system must be flushed
clean. System should be drained hot, then refilled, then drained
again until the water is clean.
†
Ensure that there is a proper electrical supply i.e. 230V fused at
3A for the permanent live.
†
Take great care with pipe connections to ensure that no
damage is done to the internal pipework.
†
Ensure that the 22mm condensate pipe is not exposed to
freezing conditions.
†
Make sure that the exhaust pipe terminates away from windows
or vents and is out of reach.
†
Make sure that the air inlet and exhaust pipe outlets are at least
300mm apart.
†
Check tightness of all connections in the boiler before firing.
†
Ensure that the terminals supplied are fitted to both the exhaust
and air inlet pipes.
†
The system must be free from air before firing.
†
If TRV's are installed on radiators ensure that a bypass is
installed to maintain required flow.
†
Complete the Gas Boiler Commissioning Checklist - Service
Interval Record (Chapter 9).
†
Complete the combustion testing (Section 4.7) using a
calibrated flue gas analyser.
WD536
The Keston C45, C40P, C55 C55P
KESTON CONDENSING BOILERS
IMPORTANT
C45, C40P & C55(P)
INSTALLATION KEY POINTS