4
Installation
4.1
Soil excavation
CAUTION
Note the structural calculations for traffic safety.
Chamber installation for load class D may require
a load distribution plate made of concrete: 0.18m x
2.3m x 2.3m (thickness x height x width).
Determine the required load class and structural
calculations in accordance with the environment /
use conditions.
Comply with the standard road construction /
cross section build-up in accordance with the
local road construction regulations (in Germany
the RASt guidelines (“Richtlinien für Anlage von
Straßen”), in the UK the Highway Design Man-
ual, etc.).
Ensure suitability of product (variant) for environmental
conditions (
) and installation
depth (
see "Product description", page 25
Define slope angle β to DIN 4124
Excavate pit. ensure a working space of at least 50 cm all
around the base.
Compact the surface (30 cm blinding layer) and level it
off.
Fig. 1: Soil excavation
EN
328-198_03
Installation and operating instructions
29 / 108
Содержание LW 600
Страница 10: ...DE 10 108 Einbau und Betriebsanleitung 328 198_04...
Страница 26: ...EN 26 108 Installation and operating instructions 328 198_03...
Страница 42: ...FR 42 108 Instructions de pose et d utilisation 328 198_03...
Страница 59: ...IT 328 198_03 Istruzioni per l installazione e l uso 59 108...
Страница 76: ...NL 76 108 Inbouw en bedieningshandleiding 328 198_03...
Страница 93: ...PL 328 198_03 Instrukcja zabudowy i obs ugi 93 108...
Страница 102: ......
Страница 103: ......
Страница 104: ......
Страница 105: ......
Страница 106: ...328 198_04 106 108...
Страница 107: ...328 198_04 107 108...