EN
5
Commissioning
Check whether the steps explained in the chapter on assembly have been carried out correctly.
Clear any building waste from the tank if necessary.
Connect to the mains connection. Make the connection to the control unit as described in the instructions enclosed with
the control unit.
Connect the system to the power supply. If applicable, lift the float switch to check whether the submersible pump starts
up automatically.
With the connection of the connection cable(s) to the power supply, the system is ready for operation.
If installed, initialisation of the control unit starts automatically (separate instructions).
38 / 132
016-228_01
Содержание Aqualift S 100
Страница 8: ...DE 8 132 Einbau und Betriebsanleitung 016 228_01...
Страница 29: ...EN 016 228_01 29 132...
Страница 50: ...FR 50 132 016 228_01...
Страница 71: ...IT 016 228_01 71 132...
Страница 92: ...NL 92 132 016 228_01...
Страница 113: ...PL 016 228_01 113 132...
Страница 128: ...128 132 016 228_01...
Страница 129: ...016 228_01 129 132...
Страница 130: ...016 228_01 130 132...
Страница 131: ...016 228_01 131 132...