background image

Fremdspracheneinleger: Decor Typ 21 - 52 

 

1  

Ausgabe 11

/04

   E

D

V-

Nr. 6902494 

 

Assembly instructions 

I Manufacturer’s 

instructions 

General 

Please observe all instructions, in particular the technical data 
and implementation restrictions! 
Heating performances may be found according to construction 
type, height and length in our Technical documentation or Internet 
web site www.Kermi.de  

Connections 

Connections: 4 x G1/2 (internal thread) arrangement according to 
wiring diagram (valve-heater with G1/2 - G3/4 transition nipple). 

Pressure 

Operating pressure: max. 10 bar 
Test pressure: 13 bar 
Operating conditions: hot water up to 110°C 

Permissible usage 

The supplied Kermi Decor heaters are solely designed for room 
heating. 
They are not suitable as seating or climbing aids. 
Depending on the inlet temperature, the heater surface may 
reach a temperature of up to 110°. 

Risk of burning! 

Complaints 

In the event of damage please contact your heating engineer! 

Attention! 

Only allow assembly and repairs to be performed by qualified 
tradesmen to assure that your rights according to the warranty for 
hidden defects law are not nullified! 

Maintenance and cleaning 

Bleed the heater following commissioning and extended periods 
of non-use. 
Use only mild, non-scouring commercially available cleaning 
agents for cleaning purposes. 

II Assembly 

sequence 

1  Read the assembly instructions carefully prior to 

mounting! 

2  Transport and store goods only in protective 

packaging! 

3 Accessory 

scope 

The accessory range 

(1)

 is size-dependent and located at the 

side between the heating pipes. 

4  Check that package contents are complete and 

undamaged! 

TYP 21 / 32 / 31 (construction height 300 - 1050) 
 Construction 

length 

Item Designation 

184-1012  1058-

1472 

1518-

2024 

2070-

2484

2530-

2944 

Drilled 

bracket 

2 2 2 3 4 5 

Collar 

2 2 2 3 4 5 

Cladding 

2 2 2 3 4 5 

Anti-removal 

yoke 

2 2 2 2 2 2 

Spacer, 

complete 

2 2 2 3 4 5 

Dummy 

plug 

1 1 1 1 1 1 

Venting 

plug 

1 1 1 1 1 1 

Clamp 

holder 

complete 

2 2 2 3 4 5 

Cover 

cap 

SW13 

2 2 2 3 4 5 

 

TYP 21 / 32 / 31 (construction height 1100 - 3000) 
 Construction 

length 

Item Designation 

184-1012  1058-

1472 

1518-

2024 

2070-

2484

2530-

2944 

Drilled bracket 

8* 

8* 

8* 

12* 

Collar 4 

8* 

8* 

8* 

12* 

Cladding 4 

8* 

8* 

8* 

12* 

Anti-removal yoke 

4* 

4* 

6* 

6* 

Spacer, complete 

0* 

0* 

0* 

0* 

Dummy plug 

2* 

2* 

3* 

3* 

Venting plug 

2* 

2* 

3* 

3* 

Clamp holder complete 

8* 

8* 

8* 

12* 

Cover cap SW13 

8* 

8* 

8* 

12* 

 

TYP 42 / 41 / 52 (construction height 300 - 1050) 
 Construction 

length 

Item Designation 

184-

460 

506-

1012 

1058-

1472 

1518-

2024 

2070-

2484

2530-

2944 

Drilled 

bracket 

2 2 3 4 5 6 

Collar 

2 2 3 4 5 6 

Cladding 

2 2 3 4 5 6 

Anti-removal 

yoke 

2 2 2 2 2 2 

Spacer, 

complete 

2 2 3 4 5 6 

Dummy 

plug 

1 1 1 1 1 1 

Venting 

plug 

1 1 1 1 1 1 

Clamp 

holder 

complete 

2 2 3 4 5 6 

Cover 

cap 

SW13 

2 2 3 4 5 6 

 

TYP 42 / 41 / 52 (construction height 1100 - 3000) 
 Construction 

length 

Item Designation 

184-

460 

506-

1012 

1058-

1472 

1518-

2024 

2070-

2484

2530-

2944 

Drilled bracket 

10* 

12* 

16* 

18* 

Collar 4 

10* 

12* 

16* 

18* 

Cladding 4 

10* 

12* 

16* 

18* 

Anti-removal yoke 

4* 

4* 

6* 

6* 

Spacer, compl. 

0* 

0* 

0* 

0* 

Dummy plug 

2* 

2* 

3* 

3* 

Venting plug 

2* 

2* 

3* 

3* 

Clamp holder, 
complete 

4 6 10* 

12* 

16* 

18* 

Cover cap SW13 

10* 

12* 

16* 

18* 

*See section 9 for multi-part heater 

Leave assembly and operating manual with the end customer! 

5  Furnish the necessary tools 
6  Drilled hole positions 

*See table, item 4 for no. of drilled brackets. 
*from construction height onwards > 1000 assembly with drilled 
bracket at top and bottom! 

7 Wall 

clearances 

8  Heater comprising several individual parts (nipple 

connection) 

Accessories: 

Item  Designation 

No. per connection 

Screw-in nipple M27 

Screw-in nipple with collar 

Union nut SW30 

4 Cover 

ring 

9 Transport 

 

Heaters must always be transported in an upright position! 

10 Assembly 
Attention: 

Place individual heater parts on a level, clean surface. 

Secure screw-in nipple M27 

(1)

 to one of the heater units 

with a 12 mm hexagon socket screw key (tightening torque 
40 Nm). 

Secure the screw-in nipple and collar 

(2)

 with union nut 

(3)

 to 

the second heater unit with the 12 mm hexagon socket screw 
key (tightening torque 40 Nm) 

Screw the union nut 

(3)

 with the screw-in nipple M 27 

(1)

 

using a fork wrench SW 27 (tightening torque 30 Nm) 

Attention: 

To stop screw parts tilting, tighten at alternate sides 1-2 
thread turns at a time. 

Clip on the cover rings 

(4)

11  Drilled bracket assembly 
Attention: 

The securing material supplied is designed for bases with an 
adequate load bearing capacity. The suitable securing 
method should always however be checked on site and the 
securing material matched to the structural situation! 

In the case of wall projections and such like, the maximum 
wall clearance will  be shortened by the thickness of the wall 
projection or insulation material! 

The bracket extender area should not be wholly in the cavity 
of the building material used! 

The length of the drilled bracket should be selected so that at 
least 2/3 of the bracket is located on the supporting wall. 

12  Drill holes:   

Diameter 18 mm, spacing see chapter 6, drill hole positions! 

Danger to life! 
Do not damage water, gas or electricity lines during drilling! 

13  Insert drilled bracket (A) in the drill hole with the slot 

facing upwards. 

Set the required wall clearance (clearance = dimension X).  
Then tighten the drilled bracket with the screwdriver (tightening 
torque 3 Nm), power screwdrivers are not permissible  

14  Align drilled brackets (A) by turning the eccentric. 

Set the drilled brackets so that the supporting surface 

(J)

 for the 

lug is always horizontal. 

15  Shorten the plastic sleeve (C) for cladding the drilled 

bracket at the inner reinforced ribbed end appropriately 
(cut edge to the wall), then mount the collar (B). 

16  Screw the nut for spacer  onto spacer (E) and set the 

wall clearance (Z), if necessary mount extension. 

17 Pre-assemble clamp holder. 
18  Remove heater packaging in the area around the 

securing places. 

19  Insert clamp holder between 3th and 4th pipe, turn the 

metal wedge behind the pipes by 90°, align to the same 
height and tighten. 

20  Insert the prepared spacer between the 3th and 4th pipe 

of the heater. 

21  Then hang the heater with the clamp holder into the 

drilled brackets (A). 

Once the heater is positioned, press the anti-removal protector 

(D)

 over the drilled bracket. 

If more than 2 securing places are features, check the exact fit of 
the brackets and, if necessary set. 

Attention: 

The film is used as building site protection  

22  Screw in all dummy plugs (F) and vent plugs (G) 

depending on the connection situation. 

23  Mounting of heaters with a larger construction height 

Insert temporary stable pedestal equal to the floor clearance. 

Perform assembly steps 1 to 19. 

Pre-assemble bottom and top clamp holder over subsequent 
position. 

Locate heater is correct position. 

Insert clamp holder from above in the drilled bracket head or 
wall bracket groove. 

Firmly tighten clamp holder. 

24  Connect heater at the water side using commercially 

available screw fittings. 

25  Remove packaging completely just before 

commissioning. 

26  Dispose of packaging material via recycling systems. 

Worn drilled brackets and accessories should be submitted for 
recycling or suitably disposed of (please observe regional 
regulations). 
 

 

Instructions de montage 

I  Remarques du fabricant 

Généralités 

Veuillez tenir compte de toutes les informations, en particulier les 
caractéristiques techniques et les limites d’utilisation 
Vous trouverez les puissances de chauffage en fonction du type 
de construction, de la hauteur totale et de la longueur totale dans 
notre documentation technique ou sur notre site Internet 
www.Kermi.de  

Raccordements 

Raccordements : 4 x G1/2 (taraudage) disposition selon le 
schéma de raccordement (radiateur à vanne avec embout de 
réduction mâle G1/2 - G3/4). 

Pressions 

Pression de service : max. 10 bar 
Pression de contrôle : 13 bar 
Conditions de fonctionnement : eau chaude jusqu’à 110°C 

Usage admissible 

Les radiateurs Kermi Decor fournis sont destinés exclusivement 
au chauffage domestique. 
Ils ne doivent pas servir de siège, de marchepied ni d’escabeau, 
n’étant pas appropriés. 
La surface du radiateur peut être très chaude et atteindre une 
température allant jusqu’à 110° C en fonction de la température 
d’alimentation. 

Risque de brûlure ! 

Réclamation 

En cas de dommage, veuillez vous adresser à votre spécialiste. 

Avertissement ! 

Veuillez faire exécuter le montage et les réparations 
exclusivement par un spécialiste, faute de quoi vos droits à la 
garantie sont inapplicables en vertu de la loi sur la responsabilité 
pour défaut d’une qualité assurée. 

Entretien et nettoyage 

Purger d’air le radiateur après sa mise en route et toute 
interruption de fonctionnement prolongée.  
Nettoyage uniquement au détergent doux non abrasif du 
commerce. 

II Déroulement 

du 

montage 

1  Avant la mise en place, lire attentivement les 

instructions de montage. 

2  Transport et stockage uniquement dans l’emballage 

protecteur. 

3 Fourniture 

d’accessoires 

La fourniture d’accessoires 

(1)

 dépend de la taille et se trouve 

latéralement entre les tubes du radiateur. 

4  Vérifier si le contenu est complet et n’est pas 

endommagé ! 

TYPE 21 / 32 / 31 (Hauteur totale 300 - 1050) 
 Longueur 

totale 

Pos Désignation 

184-1012 1058-

1472

1518-

2024

2070-

2484

2530-

2944

Console 

à 

perçage  2 2 2 3 4 5 

Rosette 

2 2 2 3 4 5 

Habillage 

2 2 2 3 4 5 

Protection anti-
extraction 

2 2 2 2 2 2 

Pièce 

d’écart. 

compl.  2 2 2 3 4 5 

Bouchon 

1 1 1 1 1 1 

Bouchons 

de 

purge  1 1 1 1 1 1 

Porte-plaquette 

compl. 

 

2 2 2 3 4 5 

Couvercle 

sur-plat 

13 2 2 2 3 4 5 

 

TYPE 21 / 32 / 31 (Hauteur totale 1100 - 3000) 
 Longueur 

totale 

Pos Désignation 

184-1012 1058-

1472

1518-

2024

2070-

2484

2530-

2944

Console à perçage 

8* 

8* 

8* 

12* 

Rosette 4 

8* 

8* 

8* 

12* 

Habillage 4 

8* 

8* 

8* 

12* 

Protection anti-
extraction 

2 2 4* 

4* 

6* 

6* 

Pièce d’écart. compl. 

0* 

0* 

0* 

0* 

Bouchon 1 

2* 

2* 

3* 

3* 

Bouchon de purge 

2* 

2* 

3* 

3* 

Porte-plaquette compl.  

8* 

8* 

8* 

12* 

Couvercle sur-plat 13 

8* 

8* 

8* 

12* 

 

TYPE 42 / 41 / 52 (Hauteur totale 300 - 1050) 
 Longueur 

totale 

Pos Désignation 

184-

460 

506-

1012

1058-

1472

1518-

2024

2070-

2484

2530-

2944

Console 

à 

perçage  2 2 3 4 5 6 

Rosette 

2 2 3 4 5 6 

Habillage 

2 2 3 4 5 6 

Protection anti-
extraction 

2 2 2 2 2 2 

Pièce 

d’écart. 

compl.  2 2 3 4 5 6 

Bouchon 

1 1 1 1 1 1 

Bouchon 

de 

purge 

1 1 1 1 1 1 

Porte-plaquette 

compl. 

2 2 3 4 5 6 

Couvercle 

sur-plat 

13 2 2 3 4 5 6 

 
 
 
 
 
 
 
 
 
 
 
 

Содержание Decor Typ 21

Страница 1: ...le positions Danger to life Do not damage water gas or electricity lines during drilling 13 Insert drilled bracket A in the drill hole with the slot facing upwards Set the required wall clearance clearance dimension X Then tighten the drilled bracket with the screwdriver tightening torque 3 Nm power screwdrivers are not permissible 14 Align drilled brackets A by turning the eccentric Set the drill...

Страница 2: ...0 C Utilizzo ammissibile consentito I radiatori Kermi Decor consegnativi servono esclusivamente per riscaldare gli ambienti Non sono studiati per esser usati da posti a sedere da struttura per arrampicarsi o salirvi sopra La superficie del radiatore può raggiungere i 110 C a seconda della temperatura di mandata Per cui sussiste pericolo d ustione Reclami In caso di eventuali danni rivolgetevi al v...

Страница 3: ... 5 6 TIPO 42 41 52 altura de construcción 1100 3000 Longitud de construcción Ref Denominación 184 460 506 1012 1058 1472 1518 2024 2070 2484 2530 2944 A Consola de taladrado 4 6 10 12 16 18 B Roseta 4 6 10 12 16 18 C Revestimiento 4 6 10 12 16 18 D Seguro contra desquicio 2 2 4 4 6 6 E Distanciador compl 0 0 0 0 0 0 F Tapón ciego 1 1 2 2 3 3 G Tapón de purga de aire 1 1 2 2 3 3 H Soporte prensor c...

Страница 4: ...предназначен для оснований с достаточной несущей способностью Однако подходящий метод крепления следует всегда определять на месте проведения работ выбирая подходящий крепежный материал с учетом окружающих условий Если на стене имеются выступающие вперед элементы и т п максимальное расстояние от стены уменьшается на толщину выступающих элементов или изоляционного материала Разжимная часть кронштей...

Страница 5: ...í systémy brát na vědomí předpisy regiónů Instrukcja montażu I Wskazówki producenta Informacje ogólne Należy przestrzegać wszystkich wskazówek a zwłaszcza danych technicznych i granic zastosowania Moce cieplne odpowiednio do typu wysokości i długości danego wykonania w naszych informacjach technicznych lub na stronie internetowej www Kermi de Przyłącza Przyłącza 4 x G1 2 gwint wewnętrzny usytuowan...

Страница 6: ...84 460 506 1012 1058 1472 1518 2024 2070 2484 2530 2944 A Κονσόλα διατρήσεων 2 2 3 4 5 6 B Ροζέτα 2 2 3 4 5 6 C Επένδυση 2 2 3 4 5 6 D Ασφάλεια ανύψωσης 2 2 2 2 2 2 E ιατηρητής απόστασης κοµπλέ 2 2 3 4 5 6 F Τυφλή τάπα 1 1 1 1 1 1 G Τάπα εξαερισµού 1 1 1 1 1 1 H Στήριγµα κοµπλέ 2 2 3 4 5 6 I Καπάκι SW13 2 2 3 4 5 6 TΥΠΟΣ 42 41 52 Κατασκ ύψος 1100 3000 Κατασκ µήκος Θέση Ονοµασία 184 460 506 1012 10...

Отзывы: