Kerlink PDTIOT-ISS05H Скачать руководство пользователя страница 9

 

 

 
Regarding the power supply, the following equipments can be used: 

 

End-Span or Mid-Span at least a 15W PoE (Power over Ethernet) (not included) 

 

 

 

 

6.5

 

Assembly instruction for sealing the connectors 

 

 
 

 
 
 
 
 

 

Pay attention to the gasket when screwing the 2 caps : if you screw too hard, it 
may twist. 

Here is an example of what is OK and what is not. 

If you use a torque wrench, the tightening torque should be 1.6 Nm maximum 

 

 

 
 

 

 

 

 

 
 
 
 
 
 

 

 

To avoid environmental aggression (moisture, pollution, etc.) and ensure their 
reliability, use a self-amalgamating tape on the N connector as show below :  

              

 

 
 

 

The Ethernet cable is not provided and must consist of two RJ45 T 568A (or 568B) plugs on 
each side. 
KERLINK recommends using a cable with the following characteristics: 

 

Category: 6A 

 

Shielding: STP (U/FTP) or SSTP (S/FTP) 

 

Section conductors: AWG26 

 

External jacket: LSZH or PUR 

 

Maximum length: 100 meters 

 

Cable gland 6.6-8.6mm. 

Operating temperature range: -40°C to +60°C 
Altitude max. < 2000m / hygrometry 95% non-condensing 

Содержание PDTIOT-ISS05H

Страница 1: ...Hz Helium LoRaWAN gateway for the Internet of Things Quick Start Guide Thank you for choosing Kerlink We are proud to be part of your project For ecological reasons this guide has been printed on recy...

Страница 2: ...oposing a comprehensive set of documents and information forself help Setup of Wirnet iStation Gateway Connection to the gateway Firmware update Packet Forwarder installation Packet Forwarder configur...

Страница 3: ...o information that clarifies or simplifies aprocedure Refers to a critical situation In case of non compliance it may result in property damage Refers to useful information during manipulations 4 Pack...

Страница 4: ...Copyright photo Kerlink all right reserved...

Страница 5: ...mber of product Do not dispose of with domestic waste MAC ADDR MAC address Product must be installed on a non flammable substrate UL94V0 Refer to the installation instructions Refer to the installatio...

Страница 6: ...le diameter shall 48mm max Mount the antenna on the pole using the U bolts as follows Mount the U bolts on the antenna Mount the antenna and U bolts on the pole Remove the cap on the N connector of th...

Страница 7: ...l connections ensure that the power supply is not connected to the mains supply GNSS and 3G 4G antennas are integrated and do not require any intervention The external LoRa antenna shall be connected...

Страница 8: ...ty use self amalgamating tape on the N connector as show below 6 4 Setting backhaul connection Once the Wirnet iStation is installed you can select up to 2 technologies to set up the access to Interne...

Страница 9: ...should be 1 6 Nm maximum To avoid environmental aggression moisture pollution etc and ensure their reliability use a self amalgamating tape on the N connector as show below The Ethernet cable is not p...

Страница 10: ...nnection The Wirnet productline embeds a web interface to allow to easily manage the gateways Trigger software upgrade update Configure the backhaul connectivity Trigger actions on the gateway Turn of...

Страница 11: ...quipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interference to radio communications However there is...

Страница 12: ...This device may not cause interference 2 This device must accept any interference including interference that may cause undesired operation of the device L metteur r cepteur exempt de licence contenu...

Страница 13: ...vices We will appreciate your time and efforts We would be very proud to get any photo of your gateway installation Can you share them to dmk kerlink com 12 Find us in Social Media We would like to he...

Отзывы: