Remove the target assembly from inside the body by rotating the operating nut 
counterclockwise. 
 
Loosen the target retainer screws, but do not remove them. 
 

Open Left Valves

 

 
 

Move the OPEN target to the top of the plate. 

 
 

Note:  Position of the SHUT target can be determined by the following chart: 

 
Valve 
Size 

 

4” 

 

6” 

 

8” 

 

10” 

 

12” 

 

14” 

Gate 
Valve “A” 

 

1” 

 

1 3/8” 

 

1 3/16” 

 

2 3/16” 

 

2 5/8” 

 

3” 

RW 
Valve “A” 

 

7/8” 

 

1 5/16” 

 

1 11/16” 

 

2 1/8” 

 

2 ½” 

 

NA 

 

Position the SHUT target as indicated below and tighten the retainer screws until snug.  
Avoid over tightening.  Repeat the procedure for the other side. 
 
 
 
 
 

Open Right Valves

 

 

The procedure is similar as for open left, but with two differences: 
 
A:  The open target is placed 

below

 the shut target. 

 
B:  The open target is placed at the very 

bottom

 of the plate. 

 
The position of the shut target above the open target is then determined and set as described 
above. 
 

Maintenance

 

 

1. Lubrication 
 
Oil upper bearing at least once per year, adding several drops of oil in the hole located on 
the top of the main stem flange. 
 
Access to lubrication hole is gained by raising the locking wrench off the main stem nut. 
 
2. Operation 

 

Содержание 2945 Series

Страница 1: ...Style 2945 2945A Parts List 6 Style 2945 2945A Trench Depths for Gate Valves 7 Style 2945 2945A Installation Maintenance 8 10 Style 2945 2945A Lower Standpipe Change Instructions 11 Style 2945A Post Extension Instructions 12 Style 641 Wall Type Indicator Post 13 Style 641 14 Flanged Base Post Indicator 14 Please check our website www kennedyvalve com for any product updates and or changes ...

Страница 2: ......

Страница 3: ......

Страница 4: ......

Страница 5: ......

Страница 6: ......

Страница 7: ......

Страница 8: ...rel over the standpipe until the grade line mark on the barrel is at ground line height and then tighten the two screws securely Fixed Length Units Cut the required length off the bottom of the standpipe so that the indicated grade line of the standpipe is at the ground line height and then secure to the base flange by tightening the two screws 4 Extension Rod Adjustments Lower the stem into the b...

Страница 9: ... tighten the retainer screws until snug Avoid over tightening Repeat the procedure for the other side Open Right Valves The procedure is similar as for open left but with two differences A The open target is placed below the shut target B The open target is placed at the very bottom of the plate The position of the shut target above the open target is then determined and set as described above Mai...

Страница 10: ...s of the operating nut in both directions should the targets or target mechanism be positioned incorrectly Should this happen readjust targets If the target mechanism falls from the operating nut it will be stopped a short distance below the window ...

Страница 11: ...he field 9 Remove the Wrench Item P 1 the 3 8 UNC Bolt Item 11A and the eyebolt Item P 10 10 Lift the assembly of the Top Section Item P 4 Operating Nut Item P 2 Target Carrier Assembly Items P 6 through P 8 etc from the Telescoping Barrel 11 If a longer Lower Standpipe has been installed it will be necessary to procure a longer Stem Slip the Crane Coupling Item P 13 over one end of the new Stem a...

Страница 12: ...m and coupling pilot holes provided on one side then pin together with pins provided 1 4 X 3 br cotter keys 7 Place stem down the inside of new extension and lower pipe assembly aligning it on the 2 square nut on valve 8 At this time remove top section with operating nut assembly from off the top of indicator post standpipe two bolts 9 Place complete upper section over top of stem and align with t...

Страница 13: ......

Страница 14: ......

Отзывы: