2945 (A) Vertical Indicator Post – Changing the Lower Standpipe 

 

1. 

Loosen (2) ¾” – UNC Bolts (Items P-15) that retain the Telescoping Barrel 
(Item P-16) to the lower Standpipe (Item P-17) 

2. 

Working in a safe manner lift off the entire top assembly (Items P-1 
through P-16) from the Telescoping Barrel and Base Flange. 

3. 

Remove the Stem (Item P-12) and Crane Coupling (Item P-13) sub-
assembly. 

4. 

Loosen the ¾” – UNC Bolts that retain the Lower Standpipe to the Base 
Flange. 

5. 

Remove the existing Lower Standpipe and set the new one into the socket 
in the Base Flange. 

6. 

Securely tighten the bolts that were loosened in Step 4 (50-100 ft. lbs) 

7. 

Working safely, slide the entire top assembly over the new Lower 
Standpipe. 

8. 

Tighten the (2) ¾” – UNC Bolts that retain the Telescoping Barrel to the 
Lower Standpipe (Item P-15) – Tighten them securely enough to safely 
maneuver the Post in the field. 

9. 

Remove the Wrench (Item P-1), the 3/8” – UNC Bolt (Item 11A) and the 
eyebolt (Item P-10). 

10. 

Lift the assembly of the Top Section (Item P-4), Operating Nut (Item P-2), 
Target Carrier Assembly (Items P-6 through P-8), etc. from the Telescoping 
Barrel. 

11. 

If a longer Lower Standpipe has been installed it will be necessary to 
procure a longer Stem.  Slip the Crane Coupling (Item P-13) over one end 
of the new Stem and cross drill a new, cotter pin hole through the new 
stem. 

12. 

If the Lower Standpipe just installed is shorter than the one it replaced, the 
Stem will have to be cut. 

13. 

Bolt the Base Flange of the sub-assembly that includes the Base Flange, 
Lower Standpipe and Telescoping Barrel to the flange of the valve, using 
the ¾” – UNC Bolts & Nuts provided by Kennedy Valve. 

14. 

Place the square socket in the Crane Coupling on the Stem & Coupling sub-
assembly over the 2” Square Nut at the top of the stem of the valve. 

15. 

See page F-4 of the Kennedy Valve Product Catalog and follow the 
directions. 

 

NOTE: Kennedy Valve does offer for sale Couplings to extend Stems. 

Содержание 2945 Series

Страница 1: ...Style 2945 2945A Parts List 6 Style 2945 2945A Trench Depths for Gate Valves 7 Style 2945 2945A Installation Maintenance 8 10 Style 2945 2945A Lower Standpipe Change Instructions 11 Style 2945A Post Extension Instructions 12 Style 641 Wall Type Indicator Post 13 Style 641 14 Flanged Base Post Indicator 14 Please check our website www kennedyvalve com for any product updates and or changes ...

Страница 2: ......

Страница 3: ......

Страница 4: ......

Страница 5: ......

Страница 6: ......

Страница 7: ......

Страница 8: ...rel over the standpipe until the grade line mark on the barrel is at ground line height and then tighten the two screws securely Fixed Length Units Cut the required length off the bottom of the standpipe so that the indicated grade line of the standpipe is at the ground line height and then secure to the base flange by tightening the two screws 4 Extension Rod Adjustments Lower the stem into the b...

Страница 9: ... tighten the retainer screws until snug Avoid over tightening Repeat the procedure for the other side Open Right Valves The procedure is similar as for open left but with two differences A The open target is placed below the shut target B The open target is placed at the very bottom of the plate The position of the shut target above the open target is then determined and set as described above Mai...

Страница 10: ...s of the operating nut in both directions should the targets or target mechanism be positioned incorrectly Should this happen readjust targets If the target mechanism falls from the operating nut it will be stopped a short distance below the window ...

Страница 11: ...he field 9 Remove the Wrench Item P 1 the 3 8 UNC Bolt Item 11A and the eyebolt Item P 10 10 Lift the assembly of the Top Section Item P 4 Operating Nut Item P 2 Target Carrier Assembly Items P 6 through P 8 etc from the Telescoping Barrel 11 If a longer Lower Standpipe has been installed it will be necessary to procure a longer Stem Slip the Crane Coupling Item P 13 over one end of the new Stem a...

Страница 12: ...m and coupling pilot holes provided on one side then pin together with pins provided 1 4 X 3 br cotter keys 7 Place stem down the inside of new extension and lower pipe assembly aligning it on the 2 square nut on valve 8 At this time remove top section with operating nut assembly from off the top of indicator post standpipe two bolts 9 Place complete upper section over top of stem and align with t...

Страница 13: ......

Страница 14: ......

Отзывы: