background image

 

 

Kennedy Valve 

Indicator Posts 

 

        Section 

 

 

 

 

 

 

 

 

 

 

 

 

Style 

2945A 

Adjustable 

Barrel        2-3 

 

Assembly Drawing 

 

 

 

 

 

 

 

 

 

Dimensions & Instructions 

 

 

 

 

 

 

 

 

 

 
Style 

2945 

Fixed 

Length         4-5 

 

Assembly Drawing 

 

 

 

 

 

 

 

 

 

Dimensions & Instructions 

 

 

 

 

 

 

 

 

 

Style 

2945 

2945A 

Parts 

List        6 

Style 2945 & 2945A Trench Depths for Gate Valves 

 

 

 

 

Style 2945 & 2945A Installation & Maintenance  

 

 

 

 

8-10 

Style 2945 & 2945A Lower Standpipe Change 

Instructions 

   11 

Style 2945A Post Extension Instructions   

 

 

 

 

 

12 

 

 

 

 

 

 

 

 

 

 

 

 

Style 

641 

Wall 

Type 

Indicator 

Post 

       13 

 
Style 

641-14 

Flanged 

Base 

Post 

Indicator 

      14 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

***Please check our website www.kennedyvalve.com for any product updates and/or changes*** 

Содержание 2945 Series

Страница 1: ...Style 2945 2945A Parts List 6 Style 2945 2945A Trench Depths for Gate Valves 7 Style 2945 2945A Installation Maintenance 8 10 Style 2945 2945A Lower Standpipe Change Instructions 11 Style 2945A Post Extension Instructions 12 Style 641 Wall Type Indicator Post 13 Style 641 14 Flanged Base Post Indicator 14 Please check our website www kennedyvalve com for any product updates and or changes ...

Страница 2: ......

Страница 3: ......

Страница 4: ......

Страница 5: ......

Страница 6: ......

Страница 7: ......

Страница 8: ...rel over the standpipe until the grade line mark on the barrel is at ground line height and then tighten the two screws securely Fixed Length Units Cut the required length off the bottom of the standpipe so that the indicated grade line of the standpipe is at the ground line height and then secure to the base flange by tightening the two screws 4 Extension Rod Adjustments Lower the stem into the b...

Страница 9: ... tighten the retainer screws until snug Avoid over tightening Repeat the procedure for the other side Open Right Valves The procedure is similar as for open left but with two differences A The open target is placed below the shut target B The open target is placed at the very bottom of the plate The position of the shut target above the open target is then determined and set as described above Mai...

Страница 10: ...s of the operating nut in both directions should the targets or target mechanism be positioned incorrectly Should this happen readjust targets If the target mechanism falls from the operating nut it will be stopped a short distance below the window ...

Страница 11: ...he field 9 Remove the Wrench Item P 1 the 3 8 UNC Bolt Item 11A and the eyebolt Item P 10 10 Lift the assembly of the Top Section Item P 4 Operating Nut Item P 2 Target Carrier Assembly Items P 6 through P 8 etc from the Telescoping Barrel 11 If a longer Lower Standpipe has been installed it will be necessary to procure a longer Stem Slip the Crane Coupling Item P 13 over one end of the new Stem a...

Страница 12: ...m and coupling pilot holes provided on one side then pin together with pins provided 1 4 X 3 br cotter keys 7 Place stem down the inside of new extension and lower pipe assembly aligning it on the 2 square nut on valve 8 At this time remove top section with operating nut assembly from off the top of indicator post standpipe two bolts 9 Place complete upper section over top of stem and align with t...

Страница 13: ......

Страница 14: ......

Отзывы: