After the legs have been attached and the unit has been moved into place check to make 

sure the coil is level to ensure proper coolant drainage.  If it is level bolt the unit to its 
foundation. 
 

ELECTRICAL WIRING 

 

 

The electrical installation should be in accordance with National Electrical Code, local 

codes and regulations.  Proper fuse protection, starters, disconnect switches, etc., for the fan 
motors must be provided in the field. 
 
 

Electrical leads from each motor terminate at the unit junction box.  Field connections 

must be made from these leads thru a starter, fuse and disconnect in accordance with local, state 
and national codes. 
 
 

Three phase motors must be connected to three-phase power and voltage to agree with 

motor nameplate. 
 

PIPING 

 
 

The design of the RH air-cooled heat exchangers is such that the cooling coil can be 

either single or multi-pass.  In a single pass unit, the coolant journeys only once through the coil.  
Connections are made to the male NPT connectors on one end of the unit and the outlet 
connections are made at the other end of the unit.  If the unit is multi-pass the inlet connections 
should be made to the higher of the two openings supplied per module, the outlet connection is 
made with the lower of the openings.  This piping arrangement is necessary to insure a cross-
counterflow coolant passage thru the unit for maximum heat transfer. 
 
 

In most RH applications a surge tank is recommended to maintain a safe coolant level in 

the system and allow entrained air to escape from the coolant. 
 

START-UP AND OPERATION

 

 

 

Check all electrical connections to be sure that they are secure and safe.  Start fan motors 

and check each fan for proper rotation.  Proper rotation should be counterclockwise looking from 
beneath the unit.  The air is discharged vertically through the top of the unit. 
 
 

Check all fluid connections for leaks after filling and pressurizing the system. 

 
 

After the above items are checked unit may be started and put into operation. 

 

FREEZE PROTECTION

 

 
 

 

When installed in areas where freezing temperatures occur, precautions must be taken for 

adequate anti-freeze protection of the radiator to prevent damage.  Normal protection consists of 
a 50% Ethylene Glycol and H2O solution.  Water used should be neutral or slightly alkaline with 
a PH of eight or more.  Water should be treated with a reputable inhibitor to forestall corrosion.  
The antifreeze and the inhibitor must be compatible. 
 
 

Содержание RH015

Страница 1: ...1 INSTALLATION OPERATION AND MAINTENANCE MANUAL FOR MODEL RH REMOTE HORIZONTAL AIR COOLED HEAT EXCHANGERS 5050 South National Dr Knoxville TN 37914 Telephone 317 227 2929 ...

Страница 2: ...D HEAT EXCHANGERS TABLE OF CONTENTS TOPIC PAGE Model Nomenclature 2 Inspection 2 Handling and Moving 2 Location 3 Assembly of Unit 3 Electrical Wiring 5 Piping 5 Start Up and Operation 5 Freeze Protection 5 Maintenance 6 Replacement Parts 7 ...

Страница 3: ... each unit is made and shipped in modules one module for the RH 035 and RH 045 two modules for the RH 055 RH 070 and RH 085 And as a preventative measure to guard against transportation damage each module is shipped on its side with the legs removed and crated on heavy duty skids It is advisable to move the modules as close as possible to its final location before uncrating It is up to the unit ri...

Страница 4: ...4 Fig 1b Lifting an RH module with slings ...

Страница 5: ...assembled except for the mounting legs Mounting legs are furnished with the necessary bolts nuts and washers The legs are not adjustable and are most easily assembled to the unit when the unit is still laying on its side as shipped Each leg is fastened to the bottom of the coil plenum by four bolts furnished with the unit Reference Figure 2 The larger RH Models RH055 and up are delivered as two se...

Страница 6: ...ctions should be made to the higher of the two openings supplied per module the outlet connection is made with the lower of the openings This piping arrangement is necessary to insure a cross counterflow coolant passage thru the unit for maximum heat transfer In most RH applications a surge tank is recommended to maintain a safe coolant level in the system and allow entrained air to escape from th...

Страница 7: ...mps fans Every 6 months Lubricant Use high grade ball bearing grease Use consistency of grease suitable for class of insulation stamped on nameplate as follows Insulation Class Consistency Type Typical Grease B or F 3 Lithium Base Shell Cyprina 3 Procedure If motor is equipped with Zerk fitting clean tip of fitting and apply grease gun Use one to two full strokes on motors CAUTION Keep grease clea...

Страница 8: ...8 REPLACEMENT PARTS If it becomes necessary to order parts please mention all identifying numbers such as model number or part number as found on the Kelvion nameplate ...

Отзывы: