background image

19

Table of contents >>

POS.No Specification

Qty

1

Lock nut m30

4

2

Washer

4

3

Bearing 30x34x40

8

4

Steering pin for swing arm

3

5

Grease nipple M8x1

4

6

Locking nut m24

1

7

Swivel arm (large)

1

8

Banjo fitting M24x65

1

9

Swing Cylinder

1

10

Plug

2

11

Swivel arm (small)

1

12

Bearing 30x34x24

4

13

Pin to swing arm

1

14

Support leg

1

15

R - pin

2

16

Pin

2

17

Pin

1

18

Locking pin

3

19

3-point frame

1

DRAWING I

Содержание 35-SKL145

Страница 1: ...Read this manual carefully before using the product Translated from the original 35 SKL145 VERGE FLAIL MOWER Light weight 1 45m...

Страница 2: ...ne assembly i 15 Machine assembly ii 16 Machine assembly iii 17 Instructions for cutting pto shaft 18 Drawing i 19 Drawing ii 20 Spare parts 22 Deviation request form 23 Warranty terms and condition 2...

Страница 3: ...be angled 90 upwards and 50 downwards which makes it excellent for cutting edges flat surfaces and hedges Standard equipped with ham mer strokes support roller and power transmission shaft INTENDED US...

Страница 4: ...but must be supplied by the user If the operating instructions gets damaged or in any other way cannot be used please contact and order a new one from Your retailer or download from manual kellfri co...

Страница 5: ...always keep a low speed use ex treme caution before routine and product knowledge is achieved The user customer is responsible to handle the situation correctly The product should not be taken into u...

Страница 6: ...al to help you and others avoid hazards and ac cidents When using the machine Take extreme caution WARNING Thissymbolindicatesthataseriousaccidentwilloccuriftheinstructionsinthemanualarenotfollowed Th...

Страница 7: ...irt gathers easily on excess grease which increases wear After lubrication wipe off excess grease from couplings Kellfri AB is constantly working to further develop their products and therefore reserv...

Страница 8: ...e hydraulic oil be changed after the first 10 hours of operation when using a new machine for the first time to remove any dirt or metal chips that may have entered the hydraulic system NOTE The oil b...

Страница 9: ...induce vomiting Drink water in small quantities In case of ingestion or discomfort contact the Poison Information Center or doctor immediately HAND PROTECTION Wear protective gloves EYE PROTECTION AL...

Страница 10: ...ry to clean or adjust the machine before the components have stopped rotating When the shear bolt in the protective device in the power take off breaks and rotors still spinning while the PTO has stop...

Страница 11: ...sport or during work NEVER allow anyone to ride on the machine The maximum transport speed should not exceed 20km h Important When driving on the public road the load or the equipment that protrudes i...

Страница 12: ...lty safety guard Warning for rotating PTO Risk of getting trap or crushing Warning for thrown objects Respect the danger zone of the machine imple ment Grease after 10h of operation Information pull o...

Страница 13: ...e Hydraulic Before each run Check all hydraulic tubes are intact not broken right connected and not leaking Machine After each run Rinse soil and grass with water id necessary TROUBLESHOOTING ERROR ME...

Страница 14: ...N PLUG OIL LEVEL PLUG REFILL TRANSMISSION OIL 80W 140 1 5 L BELT ADJUSTMENT Release the mounting bolts see illustration then adjust the adjusting bolt until the belts are sufficiently tensioned Check...

Страница 15: ...5 Table of contents MACHINE ASSEMBLY I 1 2 1 Mount the gearbox then the pulley and the belts Adjusst the belt tension and tighten all bolsts 2 Mount the cylinders one the unit and one on the swing arm...

Страница 16: ...lifting device lift the swing arm and mount it on the cutting unit 4 4 Mount the bracket for the folding arm onto the three point frame and finally assemble the 3 point frame together with the swing a...

Страница 17: ...Pull the hydraulic hoses through the loop on the three point bracket Check that the hoses are drawn through the holder and that the hoses are not sharply bend or get squeezed when the mashine is movi...

Страница 18: ...Measure and cut the transmission shaft to the desired length NOTE The shaft must not be cut more than half the length of the pipe Fill the tube edges Cut of the protection tube to the same length as...

Страница 19: ...ring pin for swing arm 3 5 Grease nipple M8x1 4 6 Locking nut m24 1 7 Swivel arm large 1 8 Banjo fitting M24x65 1 9 Swing Cylinder 1 10 Plug 2 11 Swivel arm small 1 12 Bearing 30x34x24 4 13 Pin to swi...

Страница 20: ...20 Table of contents DRAWING II...

Страница 21: ...ulley large 1 19 Bolt M12x1 25x50 1 20 Bolt M12x1 25 1 21 Pulley small 2 22 Pulley calmp bushing 35x60 1 23 Bolt M12x90 1 24 Skid left 1 25 Bolt M24x120 1 POS No Specification Qty 26 Attachement brack...

Страница 22: ...Tipping cylinder SKL145 R35 SKL145 010 Bearing knife cylinder rotor shaft SKL145 R35 SKL145 011 knife cylinder rotor shaft SKL145 R35 SKL145 012 guard for the rotor shaftSKL145 R35 SKL145 013 R60 seal...

Страница 23: ...applicable purchase and delivery terms REASON YES 11 Shipping damage 09 Product reclamation 04 Wrong delivery of product 03 Wrong quantity Buyer Customer no Address Invoice no E mail Phone no Buyer s...

Страница 24: ...guarantee do not cover Labour costs Travel expenses Any modification that the buyer himself has had made Any consequential damages that occurred due to damage to the machine Damage due to normal deter...

Отзывы: