
Section 3: Equipment startup
S530 Parametric Test System Administrative Guide
3-6
S530-924-01 Rev. D / September 2017
Recovering from an emergency shut down
To recover after an emergency shut down:
1.
Verify that the hazardous condition or emergency situation is no longer present.
2.
Rotate the EMERGENCY OFF button to release it.
3.
Toggle the power switch from ON to OFF, and then back to ON again. All of the system
instruments should power up.
4.
Open the front cabinet door and press the power/standby switch on the host computer.
Figure 40: S530 system cabinet front view