manualshive.com logo in svg
background image

Startup Guide

7

Step 7

Run “vds-id” test

A. In the Project Navigator (see 

Figure 5

), make sure the “vds-id” test is highlighted and the checkbox is

checked.

B. On the toolbar, click the green 

Run Test

button to run the test one time:

While the test is running, the 

Run Test

button turns gray and the 

Abort Test

button turns red. Also the

MEASURING indicator (located on lower right-hand corner of the front panel) will be on while the test is
running. When the test if finished, the 

Run Test

button turns green.

Troubleshooting hints:

• A selected test will not run if the 

Run Test

button is not green. Here are a few reasons why the 

Run Test

button will not be green:

-

A test is still running.

-

The checkbox for the test is not checked (see 

Figure 5

).

-

Changes to the test setup were not saved (see Step 6B).

• If a selected test still will not run, click the 

Status

tab for the test. This tab provides status information

for the test.

Click 

Run Test

to start test.

Содержание 4200-SCS

Страница 1: ...st definition Step 7 Run vds id test Step 8 View data sheet Step 9 View graph Step 10 Printing and exporting data This Startup Guide selects the default project and runs the vds id test If you wish to...

Страница 2: ...wer cord and an optional printer If using a USB printer connect it to the USB port WARNING Plug the female end of the supplied power cord into the 4200 SCS but DO NOT connect the male end to line powe...

Страница 3: ...There is no password for this account CAUTION When first starting a KTE Interactive software tool you must answer Yes to an on screen license agreement Answering No makes your system nonfunctional un...

Страница 4: ...he default project The Project Navigator for the default project is shown in Figure 1 NOTE If the Project Navigator is not displayed when KITE is started click the View menu and select the Project Nav...

Страница 5: ...vide four different gate voltages 2V 3V 4V and 5V SMU2 is used to perform a 51 point sweep of drain voltage 0V to 5V at each gate voltage A current measurement is performed at each voltage sweep point...

Страница 6: ...s to the test definition click Save All on the toolbar to save the settings Click to set up SMU2 Click to set up SMU1 Click to set up SMU3 Click to set up SMU3 These parameters set the gate voltage st...

Страница 7: ...ght hand corner of the front panel will be on while the test is running When the test if finished the Run Test button turns green Troubleshooting hints A selected test will not run if the Run Test but...

Страница 8: ...lay the data type A sample data sheet for the vds id test is shown in Figure 8 Figure 8 Sample data sheet for vds id test To select more than one sheet for selective printing hold down the Ctrl key an...

Страница 9: ...the vsd id test is shown in Figure 9 As shown there are four I V curves one for each gate voltage The graph was customized to include the Legend box and use different colors for the graph series The G...

Страница 10: ...Graph Properties and then Series to change the properties for each of the four series Click to select Legend box To display the Graph Settings menu Right click mouse anywhere in the graph area OR Fro...

Страница 11: ...heet or the Entire Workbook Data Calc and Sheet D In the Print setup window click OK to print the data Printing the Graph A In the KITE workspace click the Graph tab to display the graph B From the FI...

Страница 12: ...y Instruments Inc 28775 Aurora Road Cleveland Ohio 44139 440 248 0400 Fax 440 248 6168 1 888 KEITHLEY 534 8453 www keithley com Copyright 2003 Keithley Instruments Inc PA 716 Printed in the U S A Rev...

Отзывы: