![KEHUA TECH SPI-B2S Series Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/kehua-tech/spi-b2s-series/spi-b2s-series_user-manual_3977051026.webp)
3Installation Guide
PV Grid-Connected Inverter SPI-B2
S
Series
(1500-6000) User Manual
18
All rights reserved ©Xiamen Kehua Digital Energy Tech
Co.,Ltd
When installation, please keep the installation holder horizontal.
Figure3-8
Mark the drilling position
The depth of drilled holes should be within 45~55mm. Clear the dust and measure the net depth. Ensure
that the depth of four holes is the same.
Step 3
Install the equipped 4 expansion plugs into the holes, as shown in Figure3-9.
Figure3-9
Install expansion plugs
Step 4
Align the holes of installation holder with the expansion plugs and install the self-tapping screws and
flat gasket into the expansion plugs (as shown in Figure3-10) and fasten them by screwdriver.
Содержание SPI-B2S Series
Страница 1: ...PV Grid Connected Inverter SPI B2S Series 1500 6000 User Manual ...
Страница 8: ......