background image

1. Clean wash and sanitise the tank at

temperatures below 50°C  (122F). Do not

fill the tank with wort or liquid above 

50°C

(122F)

2. Cleaners must be diluted to suitable

concentrations before use. If extended

contact time is expected, then users

must ensure that cleaners are chemically

compatible with PET, Silicone, EPDM,

Polypropylene and Stainless Steel.

Approved cleaners and sanitisers for use

on this fermenter include: ABC (Part code

9006) Sodium Percarbonate (Part codes

6172, 6141) Sodium Metasilicate (Part

code RET4533)  Atomic 15 Foaming (Part

code 9001) Atomic 15 Annihilator (Part

code 9002) or Phosphoric acid-based

sanitisers.

3. Do not apply more than 

2.4 bar (35 psi)

 to

the tank under any circumstance.

4. NEVER connect to an unregulated

pressure source.

5. If you connect an external pressure

source; ensure it has an independent

pressure release valve (PRV) pre-set 

to below 2.4 bar (35 psi).

6. Use only the

 RED

 pressure release

valve supplied by MCH Australia Pty

Ltd on the pressure lid.

7. Do not tamper with the pressure relief

valve.

8. Do not use the tank under pressure

if it has been physically damaged i.e.

dropped on the ground

9. Do not expose to temperatures below

-2°C (28.5°F).

10. Keep the tank out of direct sunlight

and other sources of UV radiation.

11. The tank is pressure tested at

production and is marked with a date

for retesting. If it is being used under

pressure, then a hydrostatic test must

be conducted after every 24 months of 

use to ensure that it is safe for reuse.

WARNINGS

PRESSURE LID ASSEMBLY INSTRUCTIONS

1. Clean and sanitise all components prior to

assembly.

2. Thread the red pressure release valve into

the pressure lid. Screw down firmly.

3. Ensure that the gas and liquid bulkhead

fittings are correctly assembled with the

post fully tightened onto the Pressure Lid.

Insert the bulkhead fittings into the holes in

the pressure lid and tighten the locknuts.

O-rings should be located on the top

surface of the lid for correct sealing.

4. Lubricate the silicone dip tube with some

non-rinse sanitiser and slide one end over

the stem of the liquid post bulkhead fitting.

Slide the other end of the silicon tube over

the floating pickup tube.

5. Lubricate the entire silicone lid seal

with some food grade lubricant and fit

to the underside of the Gravity Lid.

6. Place the pressure lid on the mouth

of the Fermenter and ensure that the

seal seats correctly.

7. Put a small amount of food grade

lubricant on the top outer ring of the

cap.

8. Place the top thread ring over the lid

and tighten firmly.

Attention:    Ensure  the  ring  pull  on  your 

PRV  is  lying  out  of  the  way  and  not 

against  the  posts  on  the  lid  as  this  could 

result in a poor connection when attaching 

disconnects.

Отзывы: