53
e
.
.
.
.
F r o n t f o r k a s s y .
Removal sequence
:
:
:
:
Bolt M10X125X40
(
17
)
Front left absorber shock assy.
(
12
)
, front right
absorber shock assy.
(
13
)
Locknut
(
1
)
Stopper gasket
(
2
)
Groove nut
(
3
)
Anti-dust cover
(
4
)
Upper bearing steel bowl
(
3
)
Under connecting board assy.
(
14
)
Steel ball
(
16
)
under bearing steel bowl
(
11
)
Handle joint under gasket
(
10
)
Upper bearing under steel bowl
(
6
)
Under bearing upper steel bowl
(
7
)
Frame assy.
(
20
)
Installation sequence
:
:
:
:
Frame assy.
(
20
)
Under bearing upper steel bowl
(
7
)
Upper bearing under steel bowl
(
6
)
Steel ball
(
16
)
Connecting board assy.(14)
Upper bearing upper steel bowl
(
3
)
under bearing under steel bowl
(
11
)
Handle joint under gasket
(
10
)
Anti-dust cover
(
4
)
Groove nut
(
3
)
Stopper gasket
(
2
)
Locknut
(
1
Front left absorber assy. (12), front right absorber assy.
(
13
Bolt M10X125X40
(
17
)
Содержание ARN125
Страница 5: ...5 A GENERAL INFORMATION...
Страница 11: ...11 B PRODUCT...
Страница 13: ...13 1 2 3 4 5 6...
Страница 14: ...14 7 8 9 10 11 12...
Страница 24: ...24...
Страница 37: ...37 F Lubrication system Rocker arm Camshaft assy Crankshaft assy Oil pump assy Fileter assy...
Страница 52: ...52...
Страница 62: ...62...
Страница 63: ...63 Charging system circuit diagram AC circuit diagram...
Страница 72: ...72 C OTHERS...