55
NOTES: Coat bushings and shaft ends with grease to ensure proper installation, and
ensure proper spring pin installation.
TRANSITION GEAR ASSEMBLY
Removal
Transition gear assembly
Pin (6)
Washer (4)
Transition gear (3) with bracket (5) intact
Tension spring (2)
Transition gear shaft (1)
Bracket (5)
Installation procedure is reverse of removal.