INSTALLATION QUICKSTART
Spirit installation manual
page 5
5. Connect electricity
Mount pump cables of machine to correct pump.
Left: pump cables on 2-pump machine. Right: pump cables on pump/group Triplette, mains cable not
mounted yet. During 2019 machines colour coding on plugs at pump cables was introduced
Mount the mains cable directly in wall connection box or attach plug to mains power cable and plug in
wall socket. Shown below is the 3-phase plug used in Europe.
3-phase
1-phase
USA
Phase/
Live
P1
brown
black
P2
black
brown
P3
grey
Neutral
N
blue
blue
white*
Earth
E
yellow/
green
yellow/
green
green
Left: 400V 16Amp 3P-N-E plug. Right: table with mains electricity colour coding.
* The white lead in the USA cable must be hooked up to the anti-phase 115Vac live (anti-phase w.r.t.
the black 115Vac live).
6. Fire up and adjust
Turn mains switch to “ NO HEAT”
Pumps are engaged and boilers will start to fill.
Engage groups until water runs from group.
After 2 minutes, pump(s) will disengage.
Turn mains switch to
“OFF” and back to “NO HEAT” (repeatedly)
Repeat (3-6 times) until pumps stop before 2 minutes have past.
Check if water runs from all groups when these are activated
If not, check water connections.
coffee
mains
supply
steam
back
light
switch
grey
black
yellow/
green
brown
blue
back
light
switch
group 1, left
group 2, centre
group 3, right
steam