background image

9                                        

P/N O&M-BG2GRINDER

 

REPLACING GRINDER IMPELLER AND SHREDDING RING 

 
Note: This is the only disassembly operation permitted in the field. 
          All other repairs must be performed at an authorized service center or the factory. 
 

STANDARD TOOLS REQUIRED: 

 

Standard socket wrench set. 

 

Standard set of open end wrenches. 

 

Hammer. 

 

Vise grip pliers. 

 

Allen head socket set. 

 

Screwdrivers. 

 

Wire brush. 

 
CAUTION 

– Disconnect all power and control wires to motor at the control panel before starting 

                    the disassembly operations. Do not rely upon opening the circuit breaker only. 
 
IMPORTANT 

– Pump should be sanitized with bleach before starting work. 

                         Pump should be thoroughly cleaned of trash and deposits before starting  
                         disassembly operations. 
                         Wear protective gloves and clothing. 
                         Always use a rag on the impeller when turning to prevent cutting hands on the  
                         sharp edges of the shredding ring. 
 

DISASSEMBLY OF SHREDDING RING AND GRINDER IMPELLER 

 

1.  Hold the grinder impeller by prying against the impeller cutting bar  and  remove the allen head 

cap screw from the end of the shaft. 

2.  Use  a  large  screwdriver  in  the  slot  end  of  the  shaft  and  tap  (counterclockwise)  on  one  of  the 

large cutter vanes with a hammer. Tap in a counterclockwise direction (thread is right hand). 

3.  If the impeller removes easily, clean and replace if worn. 
4.  Make  sure  the  pump  impeller  has  not  loosened  when  the  grinder  impeller  was  removed.  This 

can be  checked on  reassembly of grinder  impeller and shredding ring. The tips of the impeller 
cutter  vanes  should  extend  1/8”  below  the  bottom  of  the  shredding  ring.  If  the  distance  is 
greater,  the  pump  impeller  has  loosened.  If  the  distance  is  less,  the  shredding  ring  is  not 
properly seated. 

5.  After the volute case has been removed, insert screwdriver in slot end of shaft and tap hammer 

against the outer vane of the ductile iron pump impeller (clockwise) to ensure it is threaded tight 
against shoulder on shaft. 

6.  Use large screwdriver to tap stainless steel cutter ring from cast iron volute. 
7.  Clean  all  threads  with  a  wire  brush  and  file  smooth  any  nicked  threads.  Use  NEVER-SEEZE  or 

other graphite compound on threads before replacing grinder impeller. 

8.  Make sure allen head cap screw in bottom of pump shaft is tight. Make sure the impeller turns 

freely by hand after reassembly. Some drag will be present due to the shaft seals. There should 
not be any binding or tight spots when turning the grinder impeller. 

 
 
 
 
 

 

 
 

Содержание 2hp BG2 Series

Страница 1: ...NDER _________________________________________________________________________________ INSTALLATION AND SERVICE INSTRUCTIONS AND REPAIR PARTS LIST FOR 2HP CENTRIFUGAL BUILDER S GRADE SUBMERSIBLE GRIND...

Страница 2: ...2 P N O M BG2GRINDER 01 2016 MODELS 2hp BG2 Series BG2 21 200 230 Volt 1 Phase...

Страница 3: ...re removing pump from basin be certain to close shut off valve This prevents backflow from pressure sewer Keep control panel locked or confined to prevent unauthorized access If pump is idle for long...

Страница 4: ...limit of lifting chain cable or rope Do not use lifting chain cable or rope where failure could result in loss of life Examine all lifting devices chain cable or rope for damage before and after each...

Страница 5: ...5 P N O M BG2GRINDER PUMP SPECIFICATIONS WIRING DIAGRAMS BG2 21 200 230 VOLT 1 PHASE...

Страница 6: ...Face Silicon Carbide Rotating Face Silicon Carbide Stationary Face Silicon Carbide Stationary Face Buna N Elastomer 300 Series Stainless Steel Hardware BEARING UPPER Single Row Ball Oil Lubricated BEA...

Страница 7: ...peller to be sure it is free DO NOT TURN IMPELLER WITH FINGERS AS EDGES ARE SHARP Use allen wrench in the impeller screw to turn the impeller CAUTION No persons should be in the basin when pump is low...

Страница 8: ...ed or installed backwards Pump motor damaged worn Pump may be air locked Cutter loose or jammed on shaft worn or damaged Pump is noisy Grinder impeller may be rubbing against grinder ring due to misal...

Страница 9: ...aft and tap counterclockwise on one of the large cutter vanes with a hammer Tap in a counterclockwise direction thread is right hand 3 If the impeller removes easily clean and replace if worn 4 Make s...

Страница 10: ...10 P N O M BG2GRINDER PARTS LIST BG2 21...

Страница 11: ...NC x 1 3 4 LG SST 4 CS5 16X1 3 4SS 15 Screw Cap 5 16 18UNC x 1 1 4 LG SST 6 CS5 16X1 1 4SS 16 Screw Cap 5 16 18UNC x 1 3 8 LG SST 4 CS5 16X1 3 8SS 17 Screw Allen HD 5 16 18UNC x 1 LG SST 4 SCS5 16X1SS...

Страница 12: ...ly using a phase converter or if 3 phase power is supplied by only two transformers making an open Delta system WARRANTY EXCLUSIONS Keen Pump specifically disclaims the implied warranties of merchanta...

Отзывы: