Service Manual for Medium Frequency Sine-wave Filters

GB-5

2.4.2 

Measurements at the capacitor

Unscrew and mark connections of the capacitor at the terminal strip.

The capacity measurement must be executed as follows:

It is measured between two phases of the delta-connected 

capacitors.

The following capacity value C

Meas 

must result. 

C

Meas

 = 1,5 • C

rated

 ±7,5 %

A failure may occur if one of this three measured values 

differs to the other.The capacitor must be exchanged in 

accordance with chapter 3.

The high-voltage test is made dependent on the insulation tester with the following test 

voltages:

Test voltage phase <-> ground

2,5 kV ac
3,5 kV dc

2.4.3 

Measurement of the insulation strength

The choke can be checked with a high-voltage test on its insulation strength. The test is 

done without capacitor.

Unscrew connections of the capacitor at the terminal strip

The high-voltage test is made dependent on the insulation tester with the following test 

voltages:

Test voltage phase <-> phase

Test voltage phase <-> housing

2,5 kV ac

2,5 kV ac

3,5 kV dc

3,5 kV dc

2.4.4 

Connection of the capacitor lines

The capacitor lines must be connected again in accordance with the marking if the tests are 

without complaint. The terminals must be tightened with the following tightening torque:

Terminal strip

Tightening torque terminal strip

WFF 35

3,0…6,0 Nm

WFF 70

6,0…12 Nm

WFF 120

10…20 Nm

WFF 185

14…31 Nm

WFF 300

25…60 Nm

Содержание COMBILINE

Страница 1: ...00 Z1 0ES K000 03 2008 COMBILINE GB SERVICE MANUAL Medium Frequency Sine Wave Filter...

Страница 2: ...pacitors 4 2 4 Checking of the sine wave filter 4 2 4 1 Preparations 4 2 4 2 Measurements at the capacitor 5 2 4 3 Measurement of the insulation strength 5 2 4 4 Connection of the capacitor lines 5 2...

Страница 3: ...ware software or download lists Inspections must be repeated completely even if only parts of hardware software or download lists are modified Controlling by the user Application and use of our units...

Страница 4: ...rs The following checks must be done Capacity test of the capacitors Insulation test of the choke 2 2 Required tool Torque spanner with diverse uses Capacity measuring device High voltage tester Addit...

Страница 5: ...Test voltage phase ground 2 5kVac 3 5kVdc 2 4 3 Measurement of the insulation strength The choke can be checked with a high voltage test on its insulation strength The test is done without capacitor...

Страница 6: ...steps are necessary switch system de energized secure against restart await one minute for discharge of the capacitors clean sine wave filter from dust and other contaminations 2 5 3 Disassembly of th...

Страница 7: ...Notes GB 7...

Страница 8: ...93 897 0268 fax 34 93 899 2035 mail vb espana keb de Soci t Fran aise KEB Z I de la Croix St Nicolas 14 rue Gustave Eiffel F 94510 LA QUEUE EN BRIE fon 33 1 49620101 fax 33 1 45767495 net www keb fr...

Отзывы: