KEB COMBILINE Скачать руководство пользователя страница 4

Service Manual for Medium Frequency Sine-wave Filters

GB-4

Danger by 

high voltage

KEB electronics components contain dangerous voltages which 

can cause death or serious injury. In operation, drive converters, 

depending on their degree of protection, may have live, uninsulated, 

and possibly also moving and hot surfaces.

In case of inadmissible removal of the required covers, of improper 

use,  wrong  installation  or  maloperation,  there  is  the  danger  of 

serious personal injury and damage to property.

      

2. 

Service notes

2.1 

General

The present service manual describes necessary steps at maintenance and repair of medi-

um frequency sine-wave filters. 

The following checks must be done. 

Capacity test of the capacitors

Insulation test of the choke

2.2 

Required tool

Torque spanner with diverse uses

Capacity measuring device

High voltage tester

Additional equipment for the change of the capacitors

Knife

Hot-air fan

Heat-shrinkable tube

2.3 

Life expectancy - exchange of the capacitors

The maximum life expectancy of the capacitors amounts to100,000 operating hours. After 

that the capacitors must be exchanged.

This  information  can  deviate  downwards  dependent  on  the  respective  operating  mode.  

Whether an exchange is necessary results by the following measurement.

2.4 

Checking of the sine-wave filter

2.4.1 

Preparations

switch system de-energized

secure against restart

• await five minutes for discharge of the capacitors
• clean sine-wave filter from dust and other contaminations

Содержание COMBILINE

Страница 1: ...00 Z1 0ES K000 03 2008 COMBILINE GB SERVICE MANUAL Medium Frequency Sine Wave Filter...

Страница 2: ...pacitors 4 2 4 Checking of the sine wave filter 4 2 4 1 Preparations 4 2 4 2 Measurements at the capacitor 5 2 4 3 Measurement of the insulation strength 5 2 4 4 Connection of the capacitor lines 5 2...

Страница 3: ...ware software or download lists Inspections must be repeated completely even if only parts of hardware software or download lists are modified Controlling by the user Application and use of our units...

Страница 4: ...rs The following checks must be done Capacity test of the capacitors Insulation test of the choke 2 2 Required tool Torque spanner with diverse uses Capacity measuring device High voltage tester Addit...

Страница 5: ...Test voltage phase ground 2 5kVac 3 5kVdc 2 4 3 Measurement of the insulation strength The choke can be checked with a high voltage test on its insulation strength The test is done without capacitor...

Страница 6: ...steps are necessary switch system de energized secure against restart await one minute for discharge of the capacitors clean sine wave filter from dust and other contaminations 2 5 3 Disassembly of th...

Страница 7: ...Notes GB 7...

Страница 8: ...93 897 0268 fax 34 93 899 2035 mail vb espana keb de Soci t Fran aise KEB Z I de la Croix St Nicolas 14 rue Gustave Eiffel F 94510 LA QUEUE EN BRIE fon 33 1 49620101 fax 33 1 45767495 net www keb fr...

Отзывы: