background image

© Copyright 2021 KE2 Therm Solutions, Inc., Washington, Missouri 63090

Q.3.20 (Q.1.20) May 2021

Page 2

KE2 Temp 

+ Air Defrost 

(pn 20611)

For 

Medium Temperature

 Applications with 

Air Defrost

Installation Manual

Wiring the Controller

The KE2 Temp was designed with simplicity in mind. The controller accepts 120V / 208-240V to power the controller and 12V - 240V solenoid 

voltage via the liquid line solenoid relay through the lower conduit connection. The temperature sensor and communication wires are 

attached via the upper conduit connector.

With the high voltage cover removed, the two screw terminal 

connectors can be seen. The red 2-position connector is the 

controller’s power supply. The voltage selector switch should 

be positioned to match the voltage supplied.

4

When wiring the controller first remove the display by loos-

ening the four corner screws. The display is connected to the 

lower board by a short ribbon cable.

Caution: The board may be damaged if excessive force 

is used when removing the cover.

1

After the four screws have been detached from the lower sec-

tion, the cover may be gently moved to the side. 

2

Next remove the high voltage protective cover. There are two 

screws holding it in place. 

3

5

Connect line (L1) to the left most terminal position (1) and 

neutral (L2) to terminal position (2).

6

The liquid line solenoid (LLS) relay accepts a variety of input 

voltages and is not required to match the controller’s input. 

See table for relay ratings. The relay uses the 3-position screw 

terminal to make the connection on the board.  It may control 

the liquid line solenoid or act as a pilot relay for the compressor 

contactor.  The controller will be breaking one leg of power to 

the LLS.

è

STEP 6 is continued on the next page

Voltage 

Selector

1 2 3 4 5

1 2 3 4 5

Содержание Temp + Air Defrost

Страница 1: ...conduit connectors straight or elbow as required 4 high voltage wires matched to the load of the liquid line solenoid compressor and the controller wire labeling numbers colors etc additional wire ti...

Страница 2: ...ller first remove the display by loos ening the four corner screws The display is connected to the lower board by a short ribbon cable Caution The board may be damaged if excessive force is used when...

Страница 3: ...nnected in either orientation The sensor should be fed through the top conduit connection using liquid tight cord and before being attached to the board If Modbus communication is being used a water t...

Страница 4: ...2Temp KE2 LowTemp KE2 Adaptive Control Connect wirelessly to the KE2 EM Network ENTER BACK TM thermsolutions Evaporator Efficiency Press and hold for manual defrost KE2 Temp ENTER BACK TM thermsolutio...

Страница 5: ...t ENTER Press to move between the digits to accelerate the changes ENTER Press and hold to confirm each setpoint change BACK Press to escape Only visible if CUS custom is selected for dPd Defrost per...

Страница 6: ...od Bus Address 1 1 247 Unt Units for temp display FAH FAH CEL Selecting fewer than 5 compressor starts per hour results in the starts per hour feature being turned off The compressor will then functio...

Страница 7: ...am would be 2 Once the correct time is displayed press and hold the ENTER button until d1 is displayed d 2 i 1 2 d STEP 6 Repeat steps as necessary for d2 to d12 6 1 3 1 8 STEP 4 Press the up arrow u...

Страница 8: ...Q 3 20 Q 1 20 December 2020 and all prior publications 4 50 6 68 2 30 2 79 0 20 Hole 1 09 Top View End View 2 14 2 30 Dimensions Inches Wiring Diagram Ribbon Cable Air Temp Sensor 120 208 240 1 60 CON...

Отзывы: