Loading the hydraulic system

 

 

 
Do the charging of the hydraulics, while all the 
components reside on the frame. Some of the units 
was removed from the frame to give a better overview 
of the individual components: 
 
The system consists of: 
1.

 

Power station 

2.

 

U-bracket 

3.

 

Locking pin 

4.

 

Single acting hydraulic cylinder 

5.

 

Bolts 

6.

 

2 pistons, mounted on the shovel, see next item 

 

 

 

 

Two hydraulic pistons for the shovel. 

 

 

 

 

The power station contains a very strong spring-loaded 
mechanism and do not stick fingers or any parts into 
the holes as a release causes serious injury/damages. 

 

 

 

 

 
 

 
 

 
 

 
 
 

 

Содержание 100.124

Страница 1: ...Benthic Chamber Model 100 124 Manual KC Denmark A S Research Equipment Limnology Oceanography Hydrobiology...

Страница 2: ...ded mechanism and it is activated once the hydraulic system is loaded When the hydraulic system is loaded ensure that you keep all body parts out of the shown area Burn wire 1 and 2 Releasing 1 opens...

Страница 3: ...tter overview of the individual components The system consists of 1 Power station 2 U bracket 3 Locking pin 4 Single acting hydraulic cylinder 5 Bolts 6 2 pistons mounted on the shovel see next item 4...

Страница 4: ...correct position Hold the single acting hydraulic cylinder 4 in horizontal position and fasten it with the bolts 7 Attach the U bracket 2 and push the locking pin 3 through both holes in the bracket...

Страница 5: ...ssure cylinder 1 Continue pumping until the piston aligns with the black line See also next item Do not pump the unit beyond this point 11 Maximum position for the piston Do not pump the unit beyond t...

Страница 6: ...negative and a small piece of non insulated burn wire positive causes a leakage current When activated the wire burns over and triggers a preset function See page 13 for a schematic The benthic chamb...

Страница 7: ...ttach the burn wire 1 and close the valve 3 horizontal position 18 Connect the cables for 1 The stirrer motor in the chamber 2 Burn wire for the chamber 3 Burh wire for releasing the lander 19 Connect...

Страница 8: ...B cable Once you are ready to deploy the lander insert the programming plug into the USB socket on the battery cylinder The programmed delay will start with a delay of 1 min Maintenance 21 The zinc an...

Страница 9: ...100 124 Benthic Chamber Manual 9...

Страница 10: ...100 124 Benthic Chamber Manual 10...

Страница 11: ...100 124 Benthic Chamber Manual 11...

Страница 12: ...100 124 Benthic Chamber Manual 12...

Страница 13: ...100 124 Benthic Chamber Manual 13...

Страница 14: ...to personal health and safety and economic damages When working on the unit in areas which are difficult to access or hazardous ensure to take adequate safety precautions for the operator and others i...

Отзывы:

Похожие инструкции для 100.124