background image

100.124 

 Benthic Chamber - Manual 

2

 

Benthic Chamber 

 

 

  

KC Denmark A/S is not, and cannot be held, responsible for any damage(s) made to 
equipment or to operators who ignore safety precautions or because of misuse or wrong 
operation. 
 
The below shown devices are very dangerous and may cause serious injury to people. Once 
loaded, the two burn wire systems 

1

 and 

2

 and the valve 

3

 holds both units. Breaking 

the wire 

1

 releases the shovel

, while “

2

 releases the lid for the chamber. 

 

 

 

 

 

 

 

 

 

 

The cylinder contains a spring-
loaded mechanism and it is 
activated once the hydraulic system 
is loaded. 

When the hydraulic system is loaded, 
ensure that you keep all body parts 
out of the shown area. 

Burn wire 

1

 and 

2

Releasing 

1

 opens the 

valve 

“3”, so the pistons 

closes the shovel. 

 

Item 

Preparation 

 

 

 

 
Ensure that all batteries are fully charged. Connect the 
cables; each battery has engraved identification labels 
attached. 
 

 

 

 
Raise the lander so that there is enough space for the 
benthic chamber below the lower, transverse frame of 
the lander. 
 
Mount the rack on the lander frame and fasten it by 
means of 4 bolts and locking nuts. 
 
Before deployment, adjust the height of the legs to 

determine the chamber’s penetration

 depth into the 

seabed. 
 

 

 

 

 
 

 
 

Содержание 100.124

Страница 1: ...Benthic Chamber Model 100 124 Manual KC Denmark A S Research Equipment Limnology Oceanography Hydrobiology...

Страница 2: ...ded mechanism and it is activated once the hydraulic system is loaded When the hydraulic system is loaded ensure that you keep all body parts out of the shown area Burn wire 1 and 2 Releasing 1 opens...

Страница 3: ...tter overview of the individual components The system consists of 1 Power station 2 U bracket 3 Locking pin 4 Single acting hydraulic cylinder 5 Bolts 6 2 pistons mounted on the shovel see next item 4...

Страница 4: ...correct position Hold the single acting hydraulic cylinder 4 in horizontal position and fasten it with the bolts 7 Attach the U bracket 2 and push the locking pin 3 through both holes in the bracket...

Страница 5: ...ssure cylinder 1 Continue pumping until the piston aligns with the black line See also next item Do not pump the unit beyond this point 11 Maximum position for the piston Do not pump the unit beyond t...

Страница 6: ...negative and a small piece of non insulated burn wire positive causes a leakage current When activated the wire burns over and triggers a preset function See page 13 for a schematic The benthic chamb...

Страница 7: ...ttach the burn wire 1 and close the valve 3 horizontal position 18 Connect the cables for 1 The stirrer motor in the chamber 2 Burn wire for the chamber 3 Burh wire for releasing the lander 19 Connect...

Страница 8: ...B cable Once you are ready to deploy the lander insert the programming plug into the USB socket on the battery cylinder The programmed delay will start with a delay of 1 min Maintenance 21 The zinc an...

Страница 9: ...100 124 Benthic Chamber Manual 9...

Страница 10: ...100 124 Benthic Chamber Manual 10...

Страница 11: ...100 124 Benthic Chamber Manual 11...

Страница 12: ...100 124 Benthic Chamber Manual 12...

Страница 13: ...100 124 Benthic Chamber Manual 13...

Страница 14: ...to personal health and safety and economic damages When working on the unit in areas which are difficult to access or hazardous ensure to take adequate safety precautions for the operator and others i...

Отзывы:

Похожие инструкции для 100.124