33
GB-Gas Euro Range
Oriental- Gas-20190620
FR
M
-P
DE
-0
3-
04
(N
YT
/R
&
D/
20
18
10
08
)
WARNING!
After doing conversion please remember to:
- Attach an indelible sticker on technical data plate with the new installation data.
- Fix the new seals on the regulated parts (Primary Air Bushes and Main Nozzle).
- Take pressure test of gas circuit and check for leaks.
- Properly control Gas Euro Range work according to these instructions.
- Please check main burners’ cross-lighting, stability, and flame factor.
5.1.5 Install Pipe Leg
1. Put 4 pipes on the under shelf
Tightened with external tooth washer, flat washer and nut M8.
2. Install (2 pcs side, 1 pc front, 1 pc back) stopper leg at the top of the pipe leg.
Tightened with external tooth washer, flat washer, and nut M6.
3. Install body (no.1) and table (no.2)
Tightened with external tooth washer, flat washer, and hexa M6.
Fig. 16
Содержание NGER 4-60
Страница 12: ...11 GB Gas Euro Range Oriental Gas 20190620 FRM PDE 03 04 NYT R D 20181008 Fig 1...
Страница 18: ...17 GB Gas Euro Range Oriental Gas 20190620 FRM PDE 03 04 NYT R D 20181008 NGER 9 60 G Gas Connection Fig 3...
Страница 19: ...18 GB Gas Euro Range Oriental Gas 20190620 FRM PDE 03 04 NYT R D 20181008 NGER 15 60 G Gas Connection Fig 4...
Страница 20: ...19 GB Gas Euro Range Oriental Gas 20190620 FRM PDE 03 04 NYT R D 20181008 NGER 20 60 G Gas Connection Fig 5...
Страница 25: ...24 GB Gas Euro Range Oriental Gas 20190620 FRM PDE 03 04 NYT R D 20181008 NGER 70 SERIES Table 6 Fig 10...
Страница 40: ...39 GB Gas Euro Range Oriental Gas 20190620 FRM PDE 03 04 NYT R D 20181008 9 CE Certificate CE Certificate...
Страница 41: ...40 GB Gas Euro Range Oriental Gas 20190620 FRM PDE 03 04 NYT R D 20181008...