4.6 Attaching the top crown
8
2x
To install the top crown, always start on
the left side.
Prior to positioning, the cables have to be
routed through the corresponding open-
ings of the plastic components.
• First open the door part way in order to position the
plastic part
Ⓐ
on the left.
• Close the door and attach the plastic part
Ⓐ
with
the wing nut.
• Attach the front plastic part
Ⓑ
with the two wing
nuts.
• Attach the right plastic part
Ⓒ
.
Ⓐ
Ⓑ
Ⓒ
Wing nut
M6 x 16
Washer 6,4 x 25
• Finally screw the three plastic parts in place at the
joint.
Hexagon Screw
M5 x 16
Washer 5,3 x 20
Stop nut M5
A s s e m b l y I n s t r u c t i o n s
|
KBL Tower pureEnergy 5.0
14
Содержание megaSun pureEnergy 5.0
Страница 1: ...TANNING DEVICE TANNING DEVICE ASSEMBLY INSTRUCTIONS MENU SETTINGS ...
Страница 2: ......
Страница 41: ...Remarks A s s e m b l y I n s t r u c t i o n s KBL Tower pureEnergy 5 0 41 ...
Страница 42: ...Remarks A s s e m b l y I n s t r u c t i o n s KBL Tower pureEnergy 5 0 42 ...
Страница 43: ......
Страница 44: ...Ringstraße 24 26 56307 Dernbach Germany fon 49 0 26 89 94 26 0 fax 49 0 26 89 94 26 66 ...