Installation & Owner‘s Manual
3
1.2
Installation instructions
Installation instructions
1) Connect 220VAC power to the L
、
N terminals of the centralized controller directly.
2) Do not lay the signal wire and the power wire of the centralized controller in the same power
wire pipe, there should be 300~500mm distance between two pipes.
3) The signal wire of centralized controller should not exceed 1200m.
4) No intermediate joint is allowed for the shielded cable. If joints are inevitable, crimp it with the
terminal block.
5) After the centralized controller is connected, do not use megohmmeter to inspect the
insulation of the signal cable.
6) Wiring mode of the centralized controller and the network interface:
The communication port between the centralized controller and the network interface of the air
conditioner is polarity-sensitive.The X,Y and E at both sides should correspond properly. Dot
not cross-connect the signal wires,the same to the RS485-RS232 of the centralized controller.
Correct connection
Incorrect connection
Incorrect connection
Incorrect connection